Jobs · Manufacturing · Georgia

Construction Schedule Manager

Gray · Atlanta, GA · 2 mo ago
Manufacturing$100k–$150k/yrFull-time

The Construction Schedule Manager will be responsible for providing schedule preparation, communication, review, validation, and interpretation during the design, construction, commissioning, and start-up of multiple manufacturing projects.

About the role

Gray Construction is a fully integrated design-builder delivering end-to-end solutions across construction, professional services, specialty equipment, and real estate. Founded in 1960, Gray has grown to become a nationally ranked industry leader, serving top domestic and international companies in markets such as Manufacturing, Food & Beverage, Data Centers, Advanced Technology, and Distribution.

Responsibilities

  • Provide schedule preparation, communication, review, validation, and interpretation during the design, construction, commissioning, and start-up of multiple manufacturing projects.
  • Ensure schedules are produced, maintained, updated, and issued on a regular basis during the duration of the projects.
  • Maintain awareness of project trends and alert management to potential positive and negative effects of these trends.
  • Travel to jobsites as necessary.

Qualifications

  • A minimum of 10 years’ experience in the construction industry.
  • A bachelor’s degree.
  • A fundamental understanding of design, process design, procurement, processing, packaging, material handling, and building systems.
  • Experience generating schedules using process flow diagrams (PFDs), process and instrumentation diagrams (P&IDs), and traditional construction documents.
  • Leadership skills to communicate and implement a construction sequence approach across all project workstreams.
  • Technical capability and experience in using the latest versions of Microsoft Project and Primavera.
  • Basic computer skills including word processing, spreadsheets, software, and email.
  • Excellent communication skills.
  • Physical presence in the Lexington office.
  • Self-motivated and energetic individual with a passion for collaboration and professional development.

Requirements

  • Must understand the logic relationships between the various components of turnkey food and beverage manufacturing projects.
  • Must be physically able to lift and move up to 50 pounds.
  • Must be able to stand, walk, sit, use hands, reach with hands or arms, and talk or hear.
  • Must occasionally lift and/or move up to 50 pounds.
  • Must be able to use close vision while performing the job.
  • Must be able to work in a generally moderate noise level and temperature/humidity controlled office environment.
  • Overtime may be required.

Benefits

Gray Construction offers a competitive salary range of $100K to 150K, depending on experience and qualifications. Additional benefits may include health insurance, retirement plans, and paid time off.

Similar jobs