Jobs · Management

SME Consultant - Data Center Construction

Interplay Learning · United States · 2 mo ago
RemoteRemoteManagement$50–$75/hrFull-time

Interplay Learning, the leader in immersive learning for the skilled trades, now includes Industrial Training International (ITI), the global leader in specialized industrial learning solutions. Leveraging instructor-led training, online simulations, AI, and VR, Interplay helps organizations and educational institutions upskill faster, reduce risk, and increase operational readiness. With nearly 600,000 people trained, Interplay is shaping the future of workforce development, building better careers and better lives.

About the Company

At Interplay, we love what we do. We embrace our daily challenge to push technological limits to invent better ways to make learning easier and training more powerful. We attract passionate people and invite spirited discourse. We celebrate that our jobs fit our lives, not the inverse. We are uncompromising in our belief that together: we can build better training, build better careers and build better lives for customers and our team.

Awards & Recognition
2025, Forbes, America’s Best Startup Employers
2025, Inc. 5000, Fastest-Growing U.S. Companies
2024, Best Midsize Places to Work In Austin
2024, Facilitiesnet Readers' Choice Award Winners for Software
2024, AHR Expo Innovation Awards Winners for Software

About the Role

SMEs serve as advisors to Interplay and play a key part of our growth by helping us build industry-leading training content to advance the data center industry. This is an hourly contract position with variable hours and is not eligible for company benefits. Work is 100% remote, with some availability during business hours needed to attend scheduled Zoom meetings.

Expertise Areas

At this time, we are looking for Subject Matter Experts with direct data center construction expertise in one or more of the following areas:

  • Electrical: Install switchgear, transformers, generators, UPS systems, power distribution units, busways, panels, grounding, lighting, and receptacles.
  • Network and fiber: Install structured cabling, fiber-optic cable, telecommunications systems, access control, cameras, alarms, and building controls. Terminate, splice, test, label, and certify connections between equipment rooms, racks, and network infrastructure.
  • Rack Installation: Assemble, position, anchor, bond, align, and label server racks, install rack accessories and prepare them for power, cabling, and IT equipment.
  • HVAC: Install chillers, cooling towers, air-handling units, computer room air conditioners, pumps, piping, ventilation, and controls.
  • Plumbing and Pipefitting: Install domestic water, drainage, fuel-gas piping, condenser-water piping, chilled-water piping, and equipment connections.

Responsibilities

  • Advise internal teams on industry dynamics and best practices
  • Use your expertise to support content development for VR simulations and eLearning videos
  • Advise on construction and installation
  • Develop and assist in the creation of procedure guides
  • Write and record voiceover scripts and screencasts for videos
  • Generate valid and reliable test questions/knowledge checks
  • Develop fault scenarios
  • Review courses for accuracy

Requirements

  • Extensive knowledge of Data Center Construction
  • Systematic approach to troubleshooting
  • Research skills
  • Teaching, training, or mentoring experience is ideal
  • Computer skills - G-Suite (Google Docs, Sheets, Slides)
  • Camtasia (video tutorial and presentation software), will teach
  • Writing skills for knowledge checks and procedure guides
  • Availability during business hours to attend scheduled Zoom meetings

Qualifications

  • Extensive knowledge of subject matter
  • Organized and communicative with the team
  • Desire and ability to collaborate with designers and developers and respond to queries and feedback within 1-2 business days

Benefits

  • Flexible work hours, remote work
  • Use your expertise to make an impact and provide education
  • Collaborative, supportive team

Pay

$50-75/hr (1099)

Similar jobs