Jobs · Quality Assurance · Texas

Quality Manager - Data Center Construction

Yates Construction · Wichita Falls, TX · 2 wk ago
On-siteQuality AssuranceFull-time

About the role

Provides leadership, coordination, guidance, and technical expertise in all areas of quality. Responsible for the overall daily operations of quality. Develops and administers quality related policies, procedures, techniques, initiatives, to ensure that all quality policies and practices are followed consistently on the project.

Primary Duties

  • Works with project manager, superintendents, and subcontractors in developing processes and procedures that effectively accomplish the goal of 100% compliant work that exceeds expectations
  • Collaboration among project team and subcontractors
  • Acts as an advocate for Yates Construction by maintaining good corporate ethics and promoting quality, at every opportunity, as a core value of the organization
  • Maintains active relationships with engineers, consultants, and industry association
  • Affords assistance to teams with developing a project specific quality management plan
  • Supports and follows up to ensure that project teams are following their project specific quality management plan
  • Builds and maintains system templates for various DFOW activities conducted
  • Prepares DFOW for project, as required in Quality Management Plan
  • Participates in project meetings
  • Conducts site visits and inspections of work in place
  • Affords assistance to teams with plan and constructability reviews
  • Reads and understands specifications, reference codes and standards
  • Interprets contract drawings
  • Supports and assists team with training and coaching for project team members to identify key project risks, related to quality
  • Affords assistance with risk prevention planning and follow up
  • Works closely with the Quality and Construction Science Department to ensure that we are utilizing advancements in technology to support operational excellence and reduce risk on projects
  • Determines, communicates, and documents deficiencies and ensures they are corrected in a timely manner (NCR Log)
  • Identifies and resolves problems in a timely manner, gathers and analyzes information skillfully; develops alternative solutions; works well in group problem solving situations
  • Uses reason even when dealing with emotional topics
  • Reviews shop drawings and submittals for conformance with project specifications and contract requirements
  • Initiates three phase inspection process
  • Conducts daily observations to ensure that all three phases of inspection are undertaken and implemented as designed and documents all results
  • Examines the work area to assure that all required work has been completed and is following the contract requirements and resolves any differences
  • Assists teams with plan and constructability reviews
  • Prepares and chairs preparatory meetings
  • Chairs and documents weekly QC meetings with internal and external stakeholders (Yates and subcontractors quality representatives) and external team members
  • Verifies and documents that all matters received for the project are in conformance with the approved submittal, are handled and stored appropriately, and are acceptable for use
  • Oversees daily and weekly QC/QA reports that reinforce activities that are being constructed in conformance with established standards
  • Demonstrates Yates Core Values and Principles
  • Fulfills Yates Code of Conduct
  • Safety Responsibilities and Essential Job Functions

Qualifications

  • An associate or undergraduate university degree or higher (preferably in Quality Management, Construction Management, Engineering, or a closely related field) is preferred
  • Other relevant education, training or work experience may substitute for bachelor’s degree
  • Minimum of three (3) years of construction experience as a part of a quality control supervision
  • Minimum of five (5) years industrial and/or commercial construction experience
  • Experience with large/complex quality plan implementation

Requirements

  • In-depth knowledge of the Construction Standards and Best Practices
  • Working knowledge of the International Building Code
  • Knowledge and experience of diverse project type
  • Computer skills using Procore, Viewpoint, SharePoint, MS Office

Physical Demands/Essential Job Functions

  • This job description reflects an assignment of essential functions; it does not prescribe or restrict the tasks that may be assigned.
  • Physical requirements for this role may include but not limited to walking, standing, operating tools / equipment, and lifting items (up to 25lbs).
  • Tasks may also be carried out in varying weather conditions and environments as appliable to the position.

Similar jobs