Jobs · Quality Assurance · Virginia

Data Center Construction Quality Assurance Manager

Worldwide Mission Critical · Chantilly, VA · 3 wk ago
Quality AssuranceFull-time

Primary Responsibilities

  • Develop and maintain project-specific Quality Assurance Quality Control (QA/QC) Plan inclusive of Preparatory Meetings, First of Kind Inspections, Corrective Actions, and Final Inspections.
  • Thoroughly understand all project documentation including drawings, specifications, RFIs, submittals, shop drawings, equipment data sheets, and material safety data sheets (MSDS).
  • Perform cadenced inspections on all installed product to ensure that it meets or exceeds the intent of the contract documents.
  • Report quality deficiencies to the General Contractor and trade partners via the project’s adopted software platform.
  • Drive all documented quality issues through corrective actions and closure authoring Root Cause Analyses (RCA) when required.
  • Continually audit systems installation to ensure that the key geometries, dimensions, and pathways conform to the Building Information Model (BIM).
  • Partner with General Contractor and trade partners on site logistics planning and material staging to drive greater efficiency on the site.
  • Lead weekly quality control meetings with General Contractor and trade partners.
  • Provide daily quality summaries and more detailed, weekly reports to Owner.
  • Verify that all materials and equipment delivered to the project conform to the approved submittals, free of damage, safely stored/protected, and acceptable for use.
  • Maintain log of all inspections by the Authority Having Jurisdiction (AHJ). All failed inspections are to be rectified.
  • Participate actively and directly in the development and maintenance of a strong safety culture.
  • Act as liaison between General Contractor, trade partners, equipment vendors, owner operations, and commissioning agents (CxA) throughout entirety of commissioning phase.
  • Track all project design changes and ensure that they are accurately captured in appropriate as-built documentation and BIM files.
  • Support project management team on monthly applications for payment to ensure that percentage of work installed in the field matches that which has been billed.

Qualifications

  • Bachelor’s degree in Electrical Engineering, Mechanical Engineering, or Construction Management preferred.
  • 10+ years of relevant work experience in quality assurance or quality control role in data centers or similar mission critical build typologies.
  • OSHA 30; First Aid/CPR; or able to obtain within first 90-days of hire.
  • CDCP highly preferred, but not required.
  • LEED AP highly preferred, but not required.
  • Familiarity with local and national building codes including NFPA, NEC, IBC, general life safety and egress.
  • Robust proficiency in construction management software platforms such as Procore, BlueBeam Revu, and Autodesk Cloud.
  • Strong general computing skills with a focus on Microsoft Office Suite (Word, Excel, PowerPoint, Project, and Outlook.)
  • Uncompromising commitment to safety.
  • High levels of initiative, self-direction, and attention to detail.
  • Ability to work in a close team environment.
  • Ability to motivate Contractor with solid communication skills and contract knowledge to accomplish Owner and project goals.
  • Ability to direct troubleshooting and resolution of highly complex or unusual construction problems.
  • Capable of planning and organizing internal and external resources.
  • Problem analysis.
  • Willingness to take on responsibilities with a commitment to perform.
  • Flexibility.
  • Problem-solving.
  • Decision-making.
  • Excellent communication and interpersonal skills.
  • Willingness to travel.

Similar jobs