Jobs · Consulting · Virginia

Construction Manager , Data Center Construction

Amazon Web Services (AWS) · Stafford, VA · Yesterday
ConsultingFull-time

About the role

AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. As a Data Center Construction Manager you will join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You will work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build industry‑leading, energy‑efficient data centers. On a daily basis you will be on the construction site as Amazon’s owner’s representative, interacting with construction trades, driving cost, schedule, and quality while managing vendors and contractors, and overseeing the full lifecycle from design review to construction execution and final hand‑off.

Responsibilities

  • Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.
  • Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.
  • Create construction project scope and requests for proposals.
  • Perform financial analysis of construction.
  • Manage construction projects for specific initiatives aimed at increasing the resiliency of our data centers.
  • Conduct constructability reviews of electrical and mechanical designs associated with the construction of new data centers or optimization of existing data centers.
  • Manage construction documents including submittal review, RFIs, change orders, and invoicing.
  • Ensure construction project quality control.
  • Record and report key construction metrics to team members and management.
  • Drive teams to perform troubleshooting and root‑cause failure analysis associated with equipment failures.
  • Be a leader within the group as well as within internal and external teams that support the data center.

Basic Qualifications

  • Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field.
  • Experience carrying new design concepts through exploration, development, and into deployment or mass production.
  • Experience in MS Excel, Word, and Windows Operating Systems.
  • Experience with power management and power monitoring systems.

Preferred Qualifications

  • 5+ years of project management in data centers or comparable critical infrastructure experience.
  • Knowledge of critical data center equipment.
  • Knowledge of engineering documentation, electrical diagrams, and standard operating procedures.
  • Knowledge of building codes and regulations including Life Safety, BOCA, NFPA, NEC, or OSHA.
  • Experience in Data Center Engineering Operations, with a deep understanding of electrical and mechanical data center infrastructure.
  • Experience reading and interpreting construction specifications and drawings for all domains.

Benefits

  • Comprehensive health insurance (medical, dental, vision, prescription).
  • Basic Life & AD&D insurance with optional supplemental life plans.
  • Employee Assistance Program and mental health support.
  • Medical Advice Line.
  • Flexible Spending Accounts.
  • Adoption and surrogacy reimbursement coverage.
  • 401(k) matching.
  • Paid time off and parental leave.

Pay

The base salary range for this position is $111,300 – $186,100 USD annually, with additional sign‑on payments and restricted stock units (RSUs) as part of the total compensation package.

Similar jobs