Jobs · Engineering · California

Talent Engineer

Change Order · San Francisco, CA · 2 mo ago
EngineeringFull-time

What You'll Build

  • Sourcing automation: Pipelines that surface candidates before they're actively looking. Structured workflows across LinkedIn, GitHub, research corpora, and referral networks.
  • Screening infrastructure: LLM-assisted triage that filters for fit before a human reviews. You'll own the prompts, the evaluation logic, and the quality checks that keep signal-to-noise high.
  • ATS integration: Ashby as system of record. You'll wire it to sourcing tools, comms, and scheduling so candidate state updates without manual pushing.
  • Funnel analytics: Define the metrics that matter (time-to-fill, source quality, offer accept rate), instrument the pipeline, and report with enough honesty to actually change behavior.
  • Internal tooling: Dashboards and lightweight interfaces so the team has real-time visibility without living in Ashby.

Desired Experience

  • You've scaled business functions, not just supported them. Multiple roles, multiple levels, parallel pipelines — without losing quality at volume.
  • You wire tools into systems. ATS, sourcing, outreach, screening, scheduling — each integration removes a bottleneck, each automation compounds. The recruiting engine grows faster than the headcount running it.

What We Offer

  • A real path to running a talent line, not a hypothetical one
  • A team that moves fast, owns outcomes, and doesn't hold meetings about meetings

Compensation

We are proud to offer competitive, top-of-market compensation because we want to celebrate the dedicated people who ship amazing work and drive our success. Our individual compensation is thoughtfully tailored based on your role, experience, and contributions, alongside performance-based rewards.

Similar jobs

Quality Engineer

Grammer AGBelden, MS· 4 wk ago
Quality Assuranceapply on de.jobsyn.org

Quality Engineer

Applied MedicalRancho Santa Margarita, CA· 1 mo ago
Quality Assurance$71k–$75k/yrapply on careers.appliedmedical.com

Quality Engineer

Corning IncorporatedRochester, NY· 1 mo ago
Engineeringapply on bit.ly

Quality Engineer

MANITOU GroupMadison, SD· 1 mo ago
$60k–$85k/yrapply on careers.manitou-group.com

Quality Engineer

Bastion Technologies, Inc.New Orleans, LA· 2 mo ago
Engineeringapply on bastiontechnologies.applicantpro.com

Quality Engineer

Amsted AutomotiveTaylor, MI· 2 mo ago
Quality Assuranceapply on ars2.equest.com