Jobs · OTHR · Georgia

Steam Turbine Generator

Llincorp auction services · Steam Mill, GA · 3 wk ago
OTHRFull-time

Contacts: Tel: 305-771-7750 | Cel: (809) 714-9855 | Email: info@llincorp.com

Equipment Listings

  • General Electric 1969 Turbo Generator 54 MW (Sold)

    • Turbine: 54 MW, Stage 17
    • Initial Steam: 250 psig
    • Exhaust: 3.0 IN NG
    • Steam Rate: 1250 psig
    • RPM: 3600
    • Generator Rating: 64,000 kVA
    • Voltage: 13,800 V
    • Amp: 2678
    • Hydrogen Cooled
  • General Electric 1964 Turbo Generator 27.6 MW

    • Stage: 14
    • Initial Steam: 850 psig
    • Exhaust: 2.5 IN NG
    • Steam Rate: 850 psig
    • RPM: 3600
    • Rating: 32,000 KVA
    • Voltage: 13,800 V
    • Amp: 1,071
    • Hydrogen Cooled, 3/60/800
  • General Electric 1969 Turbo Generator 54 MW (Sold)

    • Turbine: 54 MW, Stage 17
    • Initial Steam: 250 psig
    • Exhaust: 3.0 IN NG
    • Steam Rate: 1250 psig
    • RPM: 3600
    • Generator Rating: 64,000 kVA
    • Voltage: 13,800 V
    • Amp: 2678
    • Hydrogen Cooled
  • Westinghouse Turbo Generator 36.7 MW

    • 36.7 MW, 13.8 KV
    • 75 GPM, 850 PSI
    • 3600 RPM
    • 1.5 HP, 20 HP
    • 900 °F
    • 44.118 MVA

Similar jobs