Jobs · Management · California

Sr. Construction Scheduler (Level III)

APSI Construction Management · Torrance, CA · 1 wk ago
On-siteManagement$155k–$168k/yrFull-time

Daily Responsibilities

  • Updating and maintaining detailed program schedules using Oracle Primavera P6.
  • Serving as a liaison between senior schedulers, program managers, and contractors.
  • Supporting cost and resource loading across various project schedules.
  • Running reports on schedule performance, including cash flow forecasts and earned value metrics.
  • Reviewing contractor baseline and monthly schedule updates.
  • Aiding in the preparation of “what-if” scenarios to assess schedule risk and resequencing impacts.
  • Performing preliminary Time Impact Analysis (TIA) reviews and collaborating on delay resolution.
  • Maintaining schedule standards, templates, and controls documentation.
  • Participating in status update meetings and coordination sessions.
  • Assisting with quality assurance checks on scheduling deliverables.
  • Supporting change order evaluation related to time and schedule implications.
  • Collaborating closely with cost control and document management teams.

Required Qualifications

  • Bachelor’s degree in Civil Engineering, Construction Management, or related field.
  • 5–7 years of scheduling experience on large-scale vertical construction projects.
  • Proficiency in Oracle Primavera P6 and Microsoft Office Suite.
  • Familiarity with Bluebeam or other project review tools.
  • Experience supporting projects of at least $50 million in value.
  • Strong understanding of CPM scheduling concepts and construction sequencing.
  • Ability to support multiple phases or packages within a broader program.

Preferred Qualifications

  • Previous experience working on OSHPD/HCAI-regulated medical facility projects.
  • Experience with healthcare or public-sector building programs preferred.
  • Working knowledge of earned value and forensic schedule analysis.
  • Exposure to utility and infrastructure coordination within large-scale sites.
  • Ability to collaborate in a joint venture or multi-partner delivery model.
  • Comfortable mentoring junior staff or coordinating small scheduling teams.

Similar jobs

Scheduler Level 3

DCCAAnnapolis Junction, MD· 14 mo ago
Managementapply on phg.tbe.taleo.net

Construction Scheduler

Rider Levett Bucknall RLBMilwaukee, WI· 1 mo ago
Consultingapply on riderlb.rec.pro.ukg.net