QA/QC Data Center Construction Commissioning Agent
InPwr Inc. · United States · 2 wk ago
RemoteRemoteProject ManagementFull-time
Skills and Requirements
- Bachelor’s degree in Electrical Engineering is preferred but not required.
- Proven experience in electrical commissioning within data center or critical facility environments.
- In-depth knowledge of electrical systems, including switchgear, UPS, generators, and power distribution.
- Familiarity with industry standards such as NETA, NFPA, NEC, and IEEE.
- Strong problem-solving and troubleshooting skills.
- Excellent communication and teamwork skills.
- Attention to detail and a commitment to upholding high-quality standards.
- Able to thrive in a dynamic and fast-paced environment.
- Excellent organizational and time-management skills.
- Proficiency in Microsoft Office Suite (Word, Excel, PowerPoint, Outlook).
- Discretion and confidentiality when handling sensitive information.
- Able to multitask and adapt in a fast-paced environment.
- Solid written and verbal communication skills.
- Able to be resourceful and proactive when issues arise.
- Must be open to 100% travel, abiding by the 17/4 schedule.
Essential Functions
- Lead the commissioning process for electrical systems, including switchgear, UPS systems, generators, transformers, and distribution panels.
- Review and approve electrical design documents, drawings, and schematics to ensure compliance with specifications and industry standards.
- Cookordination and conduct functional testing, verification, and acceptance of electrical equipment and systems.
- Identify and rectify electrical issues, including troubleshooting faults, alarms, and anomalies.
- Provide guidance for routine maintenance and inspections of electrical systems to ensure optimal performance.
- Generate comprehensive commissioning reports and documentation, maintaining accurate records of all activities and findings.
- Develop and implement commissioning plans and procedures in collaboration with the project team.
- Provide training and support to operations staff on electrical systems and procedures.
- Stay abreast of industry best practices, codes, and standards related to data center electrical systems.
Physical Requirements
- Prolonged periods sitting at a desk and working on a computer.
- Must be able to lift up to 15 pounds at a time.