Jobs · Engineering · California

Physical Design Engineer - Full Chip Implementation

Change Order · San Jose, CA · 2 mo ago
Engineering$2k/moFull-time

About the role

Own full-chip clocking across all PVT corners and modes.
Manage MMMC (Multi-Mode Multi-Corner) timing closure at the top level.
Own timing constraints and hierarchical timing budgeting between top level and blocks.
Drive functional and timing ECO closure and achieve final timing signoff for tapeout.
Own end-to-end physical verification closure at block, sub-system, and full-chip level across DRC, LVS, ERC, antenna, density, fill, and top-level integration.
Debug complex PV violations across layout, routing, macros, IP, power grid, rule decks, and tool or setup issues, and fix violations directly in layout using Innovus.
Build a repeatable, tapeout-ready PV methodology with clean runs, waiver discipline, version control, triage, and final signoff reviews.

Key Responsibilities

  • Own full-chip clocking across all PVT corners and modes.
  • Manage MMMC (Multi-Mode Multi-Corner) timing closure at the top level.
  • Own timing constraints and hierarchical timing budgeting between top level and blocks.
  • Drive functional and timing ECO closure and achieve final timing signoff for tapeout.
  • Own end-to-end physical verification closure at block, sub-system, and full-chip level across DRC, LVS, ERC, antenna, density, fill, and top-level integration.
  • Debug complex PV violations across layout, routing, macros, IP, power grid, rule decks, and tool or setup issues, and fix violations directly in layout using Innovus.
  • Build a repeatable, tapeout-ready PV methodology with clean runs, waiver discipline, version control, triage, and final signoff reviews.

Qualifications

  • 10+ years of previous experience with chip planning, top level PD, floorplanning.
  • Experience with top-level and full-chip closure on advanced process nodes (5nm and below).
  • Experience with Cadence (Innovus, Genus) or Synopsys (Fusion Compiler) automated RTL-to-GDSII flows.
  • Experience with Synopsys PrimeTime and Cadence Tempus for timing signoff.
  • Experience with Pegasus or Calibre for physical verification signoff.
  • Experience with hierarchical timing budgeting, constraint management, and ECO closure.
  • Experience with Cadence Innovus for top-level assembly, routing, and layout fixes.
  • Deeply creative and able to think from first principles.

Skills

  • Strong Candidates May Also Have Experience With:
  • Familiarity with modern ML and LLM model architectures.
  • Ability to program with Python or another scripting language.
  • Familiarity with AI tools for programming/coding.

Benefits

  • Medical, dental, and vision packages with generous premium coverage.
  • $500 per month credit for waiving medical benefits.
  • Housing subsidy of $2k per month for those living within walking distance of the office.
  • Relocation support for those moving to San Jose (Santana Row).
  • Variety of wellness benefits covering fitness, mental health, and more.
  • Daily lunch and dinner in our office.
  • Unlimited compute budget subject to ROI justification.

How We’re Different

We believe in the Bitter Lesson. We are the first inference-focused frontier AI system, betting early on transformer and transformer-like architectures and on increasing model sizes. Our addressable market is the entirety of inference, unlike many of our competitors. We are a fully in-person team in San Jose (Santana Row), and greatly value engineering skills. We do not have boundaries between engineering and research, and we expect all of our technical staff to contribute to both and work across disciplines as needed.

Similar jobs

Chip Design Engineer

Amazon Web Services (AWS)Will County, IL· 3 mo ago
Consultingapply on amazon.jobs