Jobs · Information Technology · Texas

MEP Commissioning Engineer - Data Center Construction

Sundt Construction · Lockhart, TX · 2 mo ago
On-siteInformation TechnologyFull-time

About the role

Directs and coordinates program activities designed to provide subcontractors, management, and customers with setup and commissioning knowledge to ensure effective and economical engineering support. Analyzes contractual commitments, customer specifications, design changes, and other data to plan and develop commissioning & start-up program activities from conceptual stage through life-cycle of product.

Responsibilities

  • Capable of resolving escalated issues arising from operations and requiring coordination with other departments.
  • Conduct commissioning coordination meetings as needed with the owner, project management, contractor, and other commissioning team members as defined in the commissioning plan.
  • Ensures all construction engineering projects, initiatives, and processes are in conformance with organization's established policies and objectives.
  • Find ways to reduce operating and maintenance costs, improve the comfort of a building's occupants and extend the life of the equipment.
  • Improve, refine, and augment Sundt's commissioning procedures and documentation to enhance the commissioning team processes.
  • Manage project specific pre-start, start-up, and test-adjust-balance, and commissioning fieldwork.
  • Monitor the latest industry trends and share knowledge with commissioning team members.
  • Provides input to strategic decisions that affect commissioning and start-up engineering support.
  • Verify the operation of the systems in the commissioning scope, including establishing acceptance criteria, obtaining completed reports from the installing vendor, and direct performing testing and verification.

Requirements

  • BA/BS Engineering degree or equivalent work experience required.
  • FE designation through the NCEES or PE license preferred.
  • Must have demonstrated proficiency for all the responsibilities of a Commissioning Engineer; 5 years of experience in the commissioning field including performance contracting requirements preferred.
  • Proficiency in SCA, PECI and/or ASHRAE commissioning procedures preferred.
  • Proficient use of all Microsoft Office Suite programs.

Physical Requirements

May stoop, kneel, or bend, on an occasional basis. Must be able to comply with all safety standards and procedures. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis. Will interact with people and technology frequently during a shift/work day. Will lift, push or pull objects up to 50lbs on an occasional basis. Will sit, stand or walk short distances for up to the entire duration of a shift/work day. Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors.

Benefits

  • Market Competitive Salary (paid weekly)
  • Bonus Eligibility based on company, group, and individual performance
  • Employee Stock Ownership Plan & 401K
  • Industry Leading Health Coverage Starting Your First Day
  • Flexible Time Off (FTO)
  • Medical, Health Savings, and Wellness credits
  • Flexible Spending Accounts
  • Employee Assistance Program
  • Workplace Wellness Programs
  • Mental Health Program
  • Life and Disability Insurance
  • Employee-Owner Perks
  • Educational Assistance
  • Sundt Foundation - Charitable Employee-Owner's program

Similar jobs