Jobs · Engineering · California

Frontend Engineer

Change Order · San Francisco, CA · 2 mo ago
Engineering$130k–$160k/yrFull-time

Bobyard builds AI systems that automate takeoffs for contractors, saving them dozens of hours per project in a multi-trillion industry still running on spreadsheets and guesswork. Contractors live in our product all day — the interface has to be fast, precise, and obvious. We're Series A, backed by 8VC, Primary, and Pear, and growing fast.

About the role

You'll work on the hardest UI problem we have: rendering large construction drawings and dense estimate tables without friction. Think canvas rendering, pan/zoom performance, and tables with hundreds of rows that still feel instant. You don't need prior experience with canvas or data-dense interfaces — you need strong React/TypeScript fundamentals, real product taste, and to be a fast learner ready to go deep on a problem most junior roles never touch.

Responsibilities

  • Build and ship core product UI in React and TypeScript
  • Turn rough product direction and designs into polished, production-ready interfaces
  • Work on frontend performance — fast loads, smooth interactions, responsive rendering of large drawings and data-dense tables
  • Contribute to a reusable component library the team ships on
  • Work directly with product and design to shape features, not just implement them
  • Prototype quickly, gather feedback, and iterate toward the right UX
  • Diagnose and fix frontend bugs, rendering issues, and state management problems

Requirements

  • Strong React and modern CSS skills — you can build complex layouts and interactions without reaching for a library every time
  • Real design sense — you notice when spacing, hierarchy, or motion is off, and you fix it without being asked
  • Comfortable working from rough product direction — can fill the gap between a mock and a shippable feature
  • Fluent in TypeScript, component architecture, and frontend state management
  • High ownership mindset — you don't wait to be told what to fix
  • Fast learner who can navigate unfamiliar systems and tools quickly
  • Bachelor's degree in Computer Science or a related field, or equivalent practical experience

Nice to have

  • Experience with data-dense or canvas-heavy interfaces (tables, editors, drawing tools)
  • Personal projects or open-source work involving performance-sensitive UI
  • Exposure to construction, real estate, or other "boring industry, real problem" domains

Benefits

  • $130,000–$160,000 base salary, based on experience
  • 0.02%–0.04% equity (4-year vest)
  • Full-time, in-person role in the SF Bay Area
  • A genuinely hard, high-ownership problem from day one

Similar jobs

Frontend Engineer

InsoCoreUnited States· 2 mo ago
RemoteEngineeringapply on insocore.de