Fort Lee Vehicle Recovery Range
About the role
The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next.
Responsibilities
Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Requirements
- Business must be an 8(a) Small Disadvantaged Business
- Must comply with prevailing wage requirements
- Must provide bonding
Qualifications
No specific qualifications are listed, but contractors must be able to complete the project in accordance with the design specifications and contract drawings.
Technical Details
- Notice ID: 078e7981e3104731bc0f4dc2446d7953
- Solicitation Number: W9123626BA006
- NAICS Code: 236220
- Notice Type: Solicitation
- Set-Aside: 8(a) Small Disadvantaged Business
- Response Deadline: September 1, 2026 at 6:00 PM
- Posted Date: August 4, 2026
- Contracting Officer: MS Michael Stevenson
- Contact: michael.l.stevenson@usace.army.mil (757) 201-7233