Field Engineer (Electrical) - Data Center Construction
WEITZ-ABITAT MISSION CRITICAL · Boydton, VA · 1 wk ago
EngineeringFull-time
Location: Boydton, Virginia
About the role
EPI Power, a licensed electrical contractor and subsidiary of The Weitz Company, specializes in data center construction. The Field Engineer will assist in supervising field work, supporting the superintendent, and contributing to project execution on fast‑track data center projects. This position offers a pathway for those looking to develop a career in the superintendent field.
Responsibilities
- Participate in the development of the project plan and ensure proper execution.
- Make recommendations to the supervisor for design or other changes that enhance quality, reduce operating and maintenance costs, improve scheduled completion, and/or decrease construction costs.
- Assist the Superintendent with equipment review and planning.
- Assist the Superintendent with meetings with appropriate parties.
- Maintain and protect all tools, equipment, and materials on the jobsite.
- Assist the Superintendent with site logistics