Jobs · Engineering · Texas

Field Engineer - Data Center Construction

Sundt Construction · Haskell, TX · 2 mo ago
On-siteEngineeringFull-time

About Us

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate about the details and deliberate in everything we do. At Sundt we focus on building long-term prosperity for our clients, communities and employee-owners. We offer training that focuses on your personal and professional growth. We’re driven by skill, grit and purpose. Join us as we strive to be the most skilled builder in America.

Responsibilities

  • Assists Project Engineer in developing and maintaining as-built drawings and other work tasks.
  • Assists with or reviews and processes submittals, change orders, RFIs, and budget forecasting.
  • Ensures the timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of meeting agendas, RFIs, and daily reports.
  • Demonstrates an understanding of the project management plan (PMP) and supports its execution.
  • Demonstrates a thorough understanding of the change management process and performs project scope activities to ensure successful project completion.
  • Ensures the administration of the project quality management plan and reinforces a culture of safety throughout the project.
  • May assist in calculating daily production rates and unit costs for self-performed work.
  • Participates in risk management, including identification, analysis, response planning, and monitoring and control on a project.
  • Demonstrates competency in understanding environmental control processes for the project and takes corrective actions when necessary.
  • May oversee/manage BIM (Building Information Modeling) coordination between subcontractors and designers.
  • May be responsible for LEED (Leadership in Energy and Environmental Design) certification documentation and submittal for a building.
  • May create and update Digital Record Drawings (ORD).
  • May provide lines, grades, and layout as required for the project while maintaining an organized logbook.
  • May maintain accurate quantity logs and report quantities in compliance with the cost control manual.
  • Performs elements of budgeting and controlling costs to ensure the project is completed within the approved budget.
  • Demonstrates business acumen within area of responsibility.
  • Provides support to superintendents for the execution of the work and assists in resolving field problems as necessary.

Requirements

  • Ability to assume responsibility, interface, and communicate with others is essential.
  • Entry-level position that normally requires a four-year construction-related degree or equivalent technical/field experience.
  • Microsoft Office Suite (Outlook, Word, Excel, PowerPoint, etc.) proficiency.

Physical Requirements

  • Ability to wear personal protective equipment (including but not limited to steel-toed shoes, gloves, safety glasses, hearing protection, hardhat, vest, etc.).
  • May reach above shoulder heights and below the waist on a frequent basis.
  • May stoop, kneel, or bend on an occasional basis.
  • May use telephone, computer system, email, or other electronic devices on a limited basis to communicate with internal and external customers or vendors.
  • Must be able to comply with all safety standards and procedures.
  • Occasionally will climb stairs, ladders, etc.
  • Required to use hands to grasp, lift, handle, carry, or feel objects on a frequent basis.
  • Will interact with people frequently during a shift/workday.
  • Will lift, push, or pull objects on an occasional basis.
  • Will sit, stand, or walk short distances for up to the entire duration of a shift/workday.

Safety Level Note: This is a Safety-Sensitive position, which includes tasks that could affect the safety and health of the employee or others, such as operating equipment, handling hazardous materials, or working with power tools.

Benefits

  • Market Competitive Salary (paid weekly)
  • Bonus Eligibility based on company, group, and individual performance
  • Employee Stock Ownership Plan & 401K
  • Industry Leading Health Coverage starting your first day
  • Flexible Time Off (FTO)
  • Medical, Health Savings, and Wellness credits
  • Flexible Spending Accounts
  • Employee Assistance Program
  • Workplace Wellness Programs
  • Mental Health Program
  • Life and Disability Insurance
  • Employee-Owner Perks
  • Educational Assistance
  • Sundt Foundation - Charitable Employee-Owner's program

Similar jobs