Field Engineer (Electrical) - Data Center Construction
About the role
EPI Power is hiring a Field Engineer to join our team working on data centers. The Field Engineer will assist in the supervision of field work performed by EPI Power. This is a great role for someone who is looking to develop a career in the superintendent field. EPI Power, LLC (“EPI”) is a licensed electrical contractor and subsidiary of The Weitz Company that specializes in data centers. Our mission is to safely deliver industry-leading electrical construction solutions on a fast-track basis. We believe our employees to be our most valuable asset, and we are committed to growing a diverse and inclusive culture that inspires, motivates, and continuously improves. This role requires the ability to work 6 days per week, Monday – Saturday.
Responsibilities
- Participate in the development of the project plan and ensure proper execution
- Make recommendations to the supervisor for design or other changes that will enhance the quality of the project, reduce operating and maintain costs, improve the scheduled completion, and/or decrease construction costs
- Assist Superintendent with equipment review and planning
- Assist Superintendent with meetings with appropriate parties
- Maintain and protect all tools, equipment, and materials on the jobsite
- Assist Superintendent with site logistics and cleanup to present a professional image to the public
- Maintain accurate cost reporting and respond to RFI’s
- Assist the Superintendent, as needed, in developing, updating, and maintaining the project schedule
- Document all delays and inform Superintendent
- Assist in monitoring the field performance for all aspects of the project including employees, consultants, schedules, quality, and costs
- Maintain routine relations with owners and representatives. Major disputes or problems encountered are discussed with appropriate Supervisor
- Set up, organize, read, communicate, and update project schedules
Requirements
Experience:
- 1-2 years of experience in a Project Engineer or other construction-related role desired
- Electrical background required
- Industry related degree or coursework is a plus
Skills:
- Ability to read and interpret construction documents
- Knowledge of construction methods and materials
- High level of initiative and problem-solving skills
- Excellent verbal and written communication
- Detail-oriented and highly organized
- Flexibility to balance competing needs
- Ability to build positive relationships across the organization
Technology:
- Proficient in basic computer software including Microsoft Word, PowerPoint, Excel, and Outlook
- Ability to learn specific job-related software upon hire
Benefits
- Competitive Pay
- Rewarding Bonus Program
- Comprehensive Benefits Package with Tax-Advantaged HSA and FSA offerings
- Employer-Paid Short- and Long-Term Disability Programs
- Employer-Paid Life Insurance
- Generous Paid Time Off Provisions
- 401K Retirement Savings Plan with Company Match
- Tuition Reimbursement
- Fully Paid Parental Leave
- Voluntary Products Including: Critical Illness Insurance and Accident Insurance
- Corporate Wellness Program with Wellness Time Off and Rewards