Jobs · Engineering · Texas

Director of Engineering - Data Center Construction

Rosendin · Pflugerville, TX · 1 mo ago
On-siteEngineering$166k–$218k/yrFull-time

About the role

The Director of Engineering provides complete oversight for the direction, planning, management, and ongoing engineering operations on a regional basis. Reporting to the Senior Director or Vice President of Engineering, this position participates in senior‑level planning, develops proposals, and represents the firm in high‑value or high‑risk projects.

Responsibilities

  • Develop and oversee regional engineering operations, anticipating and mapping team skills to work requirements.
  • Recruit, train, and deploy staff throughout the region.
  • Provide HR and budgetary oversight for the regional engineering group.
  • Develop proposals, present, and secure work individually or with other firm members.
  • Direct preliminary engineering activities such as project development, programming, or schematic design, especially for large‑value or high‑risk work.
  • Oversee project close‑out, installation, manufacturing QA/QC, testing, and commissioning operations on behalf of the Operations group.
  • Act as the firm’s emissary for dispute resolution, sensitive client work, or negotiations.
  • Interpret executive‑level guidance and create complete action plans for deliverables, even when guidance is ambiguous.
  • Develop or oversee complex, interrelated project‑specific work (e.g., sequence of operations, equipment/system testing scripts, engineering products).
  • Visit project locations to assess existing conditions, perform feasibility studies, test factory‑built systems prior to shipment, and conduct field investigations.
  • Conduct value‑engineering evaluations of fully engineered designs.
  • Evaluate project/system design criteria against budgetary constraints.
  • Support pre‑construction efforts, particularly in estimating and business development.
  • Identify and develop leads, assist in closing new work, and maintain external customer relationships throughout project lifecycles.
  • Review contract requirements and ensure compliance.

Requirements

  • Advanced knowledge of building systems electrical engineering, manufacturing, or technology.
  • Advanced management skills, including work planning, resource management, fee development, staff oversight, development, and advancement planning.
  • Advanced knowledge of equipment and system testing and commissioning.
  • Ability to analyze and resolve technically complex engineering problems.
  • Proficiency with Microsoft Office (Outlook, Word, Excel, etc.); Oracle experience preferred.
  • Strong prioritization and multitasking abilities, adapting to changing priorities under time pressure.
  • Effective oral and written communication skills.
  • Self‑motivated, proactive, and an effective team player.
  • Professional interaction skills with all levels of employees, vendors, clients, trade partners, and others.

Qualifications

  • Bachelor’s degree in electrical engineering, architectural engineering, construction sciences, or a related discipline from an accredited institution.
  • Typically 12 years of related work experience (education, training, and relevant experience may be combined).
  • Registration as a licensed U.S. Professional Engineer (P.E.) is required.
  • Willingness to travel up to 50 % of the time.

Benefits

  • Employee Stock Ownership Plan (ESOP)
  • 401(k) retirement plan
  • Annual performance‑based bonus program
  • 17 PTO days per year plus 10 paid holidays
  • Medical, dental, and vision insurance
  • Term life, AD&D, and voluntary life insurance
  • Disability and income protection insurance
  • Pre‑tax flexible spending accounts (health and dependent care)
  • Charitable giving match through the Rosendin Foundation

Pay

Salary range: $166,300 – $218,300 per year, dependent on location, experience, skills, and education.

Similar jobs