Jobs · Information Technology · Texas

Data Center Construction Security Officer

Salute · Burlington, TX · 1 mo ago
On-siteInformation Technology$20/hrFull-time

Salute’s team‑oriented culture emphasizes transparent communication, collaborative development, a customer‑service mindset, and a strong commitment to safety. This position is located in Burlington, TX.

Responsibilities

  • Patrol exterior grounds of the facility.
  • Provide access control for gates, ensuring only authorized personnel are permitted.
  • Manage traffic flow at gates to prevent disruption of business operations.
  • Maintain an access log.
  • Monitor cameras after normal working hours.
  • Notify your Shift Lead or Supervisor of any issues.
  • Observe and report suspicious activity.
  • Maintain awareness of surroundings to promote physical security and safety, watching for irregular or unusual conditions that could create security concerns or hazards.
  • Observe departing personnel to protect against theft of company property and ensure authorized removal complies with client requirements.
  • Contribute to communication and awareness of security policies; warn violators of infractions such as loitering, smoking, or carrying forbidden articles.
  • Permit authorized persons to enter the property, monitor entrances and exits, and control/direct traffic.

Required Qualifications

  • Customer service experience.
  • A team player with a helpful disposition.
  • Excellent computer skills.
  • High School Diploma or equivalent.
  • Able to pass a background check and a 10‑panel drug screen (zero‑tolerance drug policy).
  • Texas DPS Guard Card.

Physical Requirements

  • Ability to lift and carry heavy equipment up to 40 lb.
  • Ability to climb ladders and multiple flights of stairs to access elevated equipment.
  • Ability to stand for long periods in various work environments.
  • Ability to bend, stoop, kneel, and reach for equipment‑related tasks.
  • Basic physical fitness to respond quickly to emergencies and navigate areas efficiently.
  • Good hand‑eye coordination and dexterity for working with small components and connectors.
  • Clear vision (with or without correction) to perform detail‑oriented tasks while wearing safety glasses.
  • Ability to differentiate color‑coded warning signs, labels, and cables.
  • Capability to work in a wide temperature range, both indoors and outdoors, including extreme weather conditions.
  • Ability to work in environments with elevated noise levels while wearing hearing protection.
  • Possession of a valid driver’s license for work‑related travel, as required.

Compensation & Benefits

The base salary range for this role is $20.00 per hour. Final compensation will be determined by job‑related factors consistent with applicable law.

  • 8 company‑paid holidays, 2 floating holidays, and PTO to support work‑life balance.
  • Medical, dental, and vision insurance enrollment starting on Day 1 (coverage begins the first of the month after 30 days of employment).
  • Employee Assistance Program available to all employees.
  • Employer‑supported 401(k) with immediate 100 % vesting, a 3 % employer match, and a 50 % match on the next 2 %.
  • Health Savings Account (HSA), mental health resources, and gym discounts.
  • Discounted group programs, including legal services, home & auto insurance, pet insurance, and ID‑theft protection.
  • Discounted group life & AD&D, short‑ and long‑term disability insurance.
  • Parental leave.

Similar jobs