Jobs · Information Technology · Texas

Data Center Construction Security Officer

Salute · Cameron, TX · 2 mo ago
On-siteInformation Technology$20/hrFull-time

About the role

At Salute, we don’t have employees. We have team members. It’s our culture, and it’s a significant driver of the success we're able to deliver for our clients. This team-oriented culture is defined by transparent communication, collaborative development and deployment of procedures and best practices, a customer service mindset both internally and externally, and a strong commitment to safety.

This position is located in Burlington, TX.

Benefits

We offer perks designed to support your well-being, your family, and your future, including:

  • Time to Recharge: 8 company-paid holidays, 2 floating holidays, and PTO
  • Comprehensive Benefits Package: Medical, Dental, and Vision that you can enroll in starting on Day 1
  • Peace of Mind: The Employee Assistance Program is available to all employees
  • Your financial future matters: Employer-supported 401(K) with immediate 100% vesting, plus a 3% employer match and a 50% match on the next 2%
  • Wellness Support: Access to HSA, mental health resources, and gym discounts
  • Extra Protection & Perks: Discounted group programs, such as legal services, home & auto insurance, pet insurance, and ID theft protection

Responsibilities

As a Data Center Construction Security Officer, you will conduct unarmed foot and/or vehicle patrol, control access and egress, monitor closed-circuit televisions and alarm systems, compose reports, deter criminal activity, and misconduct, and perform other duties as specified in post orders.

  • Patrol exterior grounds of the facility
  • Provide access control for gates ensuring only authorized personnel are permitted
  • Manage traffic flow at gates to ensure no disruption in business operations
  • Maintain access log
  • Monitor cameras after normal working hours
  • Notify your Shift Lead of Supervisor of any issues
  • Observe and report suspicious activity
  • Maintain awareness of surroundings to promote physical security and safety
  • Contribute to communication and awareness of security policies and issues as needed

Qualifications

To be successful in this role, you should have:

  • Customer service experience
  • A team player with a helpful disposition
  • Excellent computer skills
  • High School Diploma or equivalent
  • Able to pass a background check and 10-panel drug screen (zero tolerance drug policy)
  • Texas DPS Guard Card

Physical Requirements

This role requires:

  • Ability to lift and carry heavy equipment, up to 40lbs
  • Ability to climb ladders and multiple flights of stairs to access elevated equipment
  • Ability to stand for long periods of time in various work environments
  • Ability to bend, stoop, kneel, and reach for equipment related tasks
  • Basic physical fitness to respond quickly to emergency situations and navigate areas quickly
  • Good hand-eye coordination and dexterity for working with small components and connectors
  • Clear vision, with or without correction, to perform tasks requiring attention to detail and precision while wearing safety glasses
  • Ability to differentiate between color-coded warning signs, labels, and cables
  • Ability to work in environments with a wide variety of temperatures inside a facility
  • Ability to work outdoors in various weather conditions, including extreme temperatures, rain, or snow
  • Capability to work in environments with elevated noise levels while wearing hearing protection
  • Possession of a valid driver’s license for work-related travel, as required

Pay

The base salary range for this role is $20.00 per hour. Our comprehensive benefits include health, dental, and vision insurance, Health Savings Account (HSA), gym discount, mental health, Discounted Group Life & AD&D, Discounted Group Short & Long-term Disability, 401(k) retirement matching, PTO/paid holidays, and parental leave.

Similar jobs