Data Center Construction Safety Facilitator - TX
CBRE · Red Oak, TX · 1 wk ago
Human ResourcesFull-time
About the role
Monitor construction projects for clients, with direct accountability for project delivery on data center projects. Join our team onsite in Red Oak, TX! Relocation assistance is available for the right candidate.
Responsibilities
- Routinely monitor the GC’s EHS performance to ensure compliance with stated practices, procedures, regulatory requirements, and any additional owner expectations/deliverables identified in the contract.
- Interface and support the construction management team by delivering current data on GC EHS performance, including trending, incident management, EHS metrics, and other key information to enable informed, timely decisions.
- Participate in communication methods such as safety meetings and notices to ensure relevant EHS information is shared across the site by GCs and included in DC management updates.
- Ensure a daily walkabout/safety tour is conducted with the GC management, representative, and the owner’s representative (PM or delegate), as practicable. PM management (not delegate) should still target a weekly walkabout/inspection at a minimum.
- Participate in a daily site tour with the GC safety representative.
- Act as a coach and advisor to the safety committee.
- Support the business in conducting risk and hazard assessments.
- Participate in Significant Incident investigations and Significant Potential Event (SPE) reviews.
- When non-compliance by a GC or their subs is observed, immediately bring the issue to the attention of the GC while ensuring the owner’s management rep/PM is informed.
- Ensure KPIs, leading and lagging indicators, and EHS data submitted by the GC are accurate, timely, and complete.
- Conduct the monthly GC EHS evaluation.
- Issue the weekly EHS summary.
- Oversee execution of the Boots on the Ground program.
- Participate in progress and schedule meetings where EHS is impacted.
- Assist in design reviews throughout the lifecycle (planning, design, permitting, construction, Cx, and handover to operations).
- Support the development of the Data Center Construction EHS Plan (DCCEHSP).
- Other duties as assigned.
Requirements
- Bachelor's degree in Architecture, Engineering, Construction Management, or a related field. In lieu of a degree, relevant experience will be considered.
- Minimum of four or more years of construction administration, architecture, engineering, or similar experience.
- Previous data center construction experience is preferred.
- Intermediate skills with Microsoft Office Suite and Google Suite.
- Ability to read and understand architectural drawings.
- Knowledge of MS Project, leases, contracts, and construction practices.