Data Center Construction Safety Facilitator - Midlothian, TX
CBRE · Midlothian, TX · 1 wk ago
Human ResourcesFull-time
Join our team onsite in Midlothian, TX! We are willing to provide relocation assistance for the right candidate.
Responsibilities
- Routinely monitor the GC’s EHS performance to ensure compliance with their stated practices and procedures, regulatory requirements, and any additional owner expectations/deliverables identified in the contract of work.
- Interface and support the construction management team at site by delivering current data on GC EHS performance, including trending, incident management, EHS metrics, and other key information to enable informed, timely decisions.
- Participate in communication methods, such as safety meetings and notices, to ensure relevant EHS information is communicated across the site by GCs and that DC management is included.
- Ensure a daily walkabout/safety tour is conducted with the GC management, representative, and the owner’s representative (PM or delegate), as practicable. PM management (not delegate) should still target a weekly walkabout/inspection at a minimum.
- Participate in a daily site tour with the GC safety rep.
- Act as a coach and advisor to the safety committee.
- Support the business in the conduct of risk and hazard assessments.
- Participate in Significant Incident investigations and Significant Potential Event (SPE).
- When a non-compliance by a GC or their subs is observed, immediately bring the issue to the attention of the GC while also ensuring the owner’s management rep/PM is informed.
- Ensure KPIs, leading and lagging indicators, and EHS data submitted by the GC is accurate, timely, and complete.
- Conduct the monthly GC EHS evaluation.
- Issue the weekly EHS summary.
- Oversee execution of the Boots on the Ground program.
- Participate in progress and schedule meetings where EHS is impacted.
- Assist in design reviews throughout the lifecycle (planning, design, permitting, construction, Cx, and handover to operations).
- Support the development of the DCCEHS Plan (Data Center Construction EHS Plan).
- Other duties as assigned.
Requirements
- Bachelor's degree in Architecture, Engineering, Construction Management, or related field. In lieu of a degree, experience will be considered.
- Minimum four or more years' construction administration, architecture, engineering, or similar experience.
- Previous data center construction experience is preferred.
- Intermediate skills with Google Suite.
- Ability to read and understand architectural drawings.
- Knowledge in project and safety software and construction practices.
- Familiarity with construction best practices, general building codes, and various building types and systems.
- Passion for being detail-oriented and highly organized.
- Applicants must be currently authorized to work in the United States without the need for visa sponsorship now or in the future.