Jobs · Management · Ohio

Construction Scheduler - T&D/Substation - Columbus, OH

Quanta Infrastructure Solutions Group · Columbus, OH · 3 mo ago
On-siteManagementFull-time

About the role

Job Title: Scheduler P6
Location: 4249 Easton Way, Columbus, OH 43219 - Onsite M-F
Travel: Up to 15% domestically

Responsibilities

  • Develop and maintain Linear Schedule Method (LSM) and Critical Path Method (CPM) schedules, integrating cost- and resource-loaded plans that drive project efficiency.
  • Collaborate closely with engineers, estimators, procurement specialists, suppliers, and trade contractors to create, baseline, and update project schedules using industry-leading software.
  • Align project schedules with financial goals by connecting the Work Breakdown Structure (WBS) to the Financial Breakdown Structure (FBS).
  • Produce cost- and resource-loaded schedules, generate cash flow curves, and track earned value metrics and Key Performance Indicators (KPIs).
  • Support project teams in optimizing work sequences, improving productivity durations, and proactively managing risks.
  • Perform schedule analysis, time impact analysis, and maintain thorough documentation to ensure project transparency.
  • Champion short-interval scheduling practices and support continuous improvement initiatives.
  • Contribute to high-visibility projects that directly impact infrastructure growth and community development.

Requirements

  • 4+ years of experience developing resource- and cost-loaded schedules, with a strong understanding of earned value metrics.
  • Advanced Proficiency in Primavera P6 required.
  • Familiarity with TILOS and Acumen software is a plus!
  • Direct experience working with design, permitting, procurement, construction, and commissioning teams on heavy construction, power delivery, or water infrastructure projects.
  • Exceptional communication skills and the ability to collaborate across all levels of the organization.
  • Self-starter with strong time management, organizational skills, and attention to detail.

Qualifications

  • High school diploma or equivalent required.
  • Bachelor’s degree in Business Administration, Engineering, Construction Management, or related field preferred.

Skills

  • Advanced proficiency in Primavera P6.
  • Experience with TILOS and Acumen software.
  • Strong understanding of earned value metrics.
  • Collaborative and communicative skills.
  • Time management and organizational skills.

Benefits

  • Competitive base salary + annual bonus potential
  • Generous PTO & paid holidays
  • 401(k) with a generous match
  • Comprehensive benefits – medical, dental, vision, and life insurance
  • Weekly pay for consistent, reliable compensation
  • Mentoring & career growth opportunities

Pay

Competitive base salary + annual bonus potential

Schedule

Onsite M-F

Similar jobs