Construction Project Manager (Heavy Civil Highway/Bridge)
MasTec Civil, LLC, a MasTec Company · Tampa, FL · 1 mo ago
On-siteInformation TechnologyFull-time
We need to output HTML fragment with sections: About the role? The posting includes company overview and description. We need headings: About the role, Responsibilities, Requirements, Qualifications, Skills, Benefits, Pay, Schedule. Only include sections that have real specific content. The posting includes: Company Overview (maybe About the role). Responsibilities are listed. Qualifications (Bachelor's degree etc). Knowledge/Skills/Abilities (Skills). Benefits (What's In It For You includes financial wellbeing etc). Pay: "Compensation commensurate with experience" is vague; we should not include Pay section because it's not specific (commensurate with experience). Schedule: not mentioned. So we include About the role (company overview), Responsibilities, Qualifications, Skills, Benefits. Possibly also Requirements? The qualifications section includes requirements; but we have Qualifications heading. Could also have Requirements separate but we can combine. The instruction: Use headings for section headings (e.g. About the role, Responsibilities, Requirements, Qualifications, Skills, Benefits, Pay, Schedule). We should include only those with real content. So we will have About the role, Responsibilities, Qualifications, Skills, Benefits.
We must not repeat job title as heading. No Job ID. Remove boilerplate: EEO, accommodation, etc. Also remove duplicated lines. Preserve all substantive info.
We need to format with
for each heading, then content:
for prose,
- for lists.
We need to extract content.
Let's parse:
Company Overview paragraph(s):
"Founded in 1987, MasTec Civil (formerly known as Condotte America), a MasTec Company, is a heavy highway contractor specializing in the construction of complex transportation projects that include roadway, bridges, interchanges, mass transit, and tolling facilities. In short, we build the roads and bridges connecting our families, communities, and nation. In doing so, client satisfaction is of primary importance to us, and our record reflects our emphasis on understanding our client needs in order to exceed their expectations. MasTec Civil is part of the MasTec Clean Energy & Infrastructure (CE&I) business segment. The CE&I segment generates over $4.5 billion in annual revenue, providing construction services across our renewables, industrial, infrastructure, and general building operating groups. Sustainability and safety are foundational to our culture and influence everything we do. MasTec, a minority-owned Fortune 500 company, has shaped the construction industry for more than 90 years. With over 35,000 employees and 400 offices nationwide, we provide flexibility and career growth in dynamic work environments. Join one of the largest construction firms in the country (Engineering News-Record [ENR]: #1 in Power, #16 Top 50 Domestic Heavy Contractors, #13 Transportation Contractor)."
That's About the role.
Responsibilities: many bullet-like sentences. We need to extract list items. The responsibilities section includes headings like Planning and Scheduling, Project Coordination, Personnel Selection, Contract Documents, Cost Control, Subcontractor/Vendor Management, Documentation, Public Relations, Safety. Each has details. We'll create a
- with each responsibility as
- . Could break into subpoints but okay. We need to preserve all substantive info; not invent. Let's list responsibilities items: From text: Planning and Scheduling : - Make a thorough study of the project to be performed. - Discuss your plans, schedules, and details. Problems etc. with your Division Personnel and your Management team. - Assess your needs fully including personnel, equipment, materials, etc. and the time frame feasible for performance. - Determine your best course of action and continue planning throughout the project for possible improvements. - As part of the planning phase the following items are the responsibility of the Project Manager: Field Office Site Plan, Trailers, Permits and Fees, Establishing Utilities, Employee Parking, Temp. Roads, Lay Down Areas, Tool Cribs, Insurance & Bonds, Safety & First Aid. Project Coordination : - The Project Manager is the Company’s top representative at the project. Thus, the Project Manager shall attend all progress meetings with the Owner/Engineer and ensure that all required documents are submitted to the Owner in a timely manner. - The Project Manager should conduct internal scheduling meetings with the Superintendents, Foremen and Subcontractors on a regular basis in order to properly coordinate work areas, labor, equipment, material and survey needs. - In addition, it is expected that Pre-Activity Meetings be conducted prior to significant items of work (ie . Asphalt, concrete deck placements, girder/beam erection, traffic shifts, etc.) to discuss the responsibilities, means & methods (equipment, labor, etc.), MOT requirements, safety aspect, quality control requirements, etc. Personnel Selection : - The Main Office and HR Department will assist you in selecting key members of your management team. - Personnel selection for all other project level employees will be your responsibility. - The Project Manager should coordinate the projects staffing needs with the Human Resources Department. - As the head of the field office, the Project Manager is responsible to ensure that that the company policies are enforced. - The Project Manager is responsible for the supervision of the Project Engineer and other engineer staff. - The Project Manager should coordinate with the Project Engineer the hiring of outside Specialty Engineers for items of work that require highly technical analysis. - As part of the management of the engineering staff, the Project Manager should serve as a mentor to young engineers assigned to the project. Contract Documents: - Familiarize yourself with your contract, specifications, plans, addendums, revisions, special provisions, permits, utility relocation schedules, etc. - Know what is required for each item of work and how you get paid for the same. - Be aware of any situation that entitles you to extra pay or warrants documentation for the initiation of a possible claim. - Project Manager must review and approve all invoices, subcontractor payments and timesheets prior to processing at the Main Office. - Study each cost report in detail and note all variances in costs from estimates. Cost Control : - The Project Manager is responsible for the project’s budget and discuss with the Estimator all variances noted. - The Project Manager shall understand the pay item estimate work sheets and communicate the information to the supervisors. - Evaluate the cost effectiveness of the procedures in place and replace all those that are deemed ineffective. - Take all necessary measures to avoid unplanned occurrences that mighty increase cost, such as accidents and injuries, equipment abuse, etc. - Ensure that change orders and/or claims are properly documented, prepared and submitted to the Owner in a timely manner. - Review and approve all budget changes and cost transfers. - The Project Manager shall provide a monthly Project Status Report to accompany the monthly cost report. - The Project Manager shall ensure that the monthly cost reports are reflective of the actual field performance. - Cost reports shall have accurate quantities and projections. Subcontractor/ Vendor Management: - The Project Manager is responsible for the negotiations of subcontractors and vendors. - Ensure that all subcontractors and vendors are paid in a timely manner in accordance with subcontract requirements and internal company procedures. - Manage the subcontractor and vendor claims, change orders and disputes. Documentation : - Proper documentation is essential for the benefit of the Project and the Company. - Ensure that all project team members (Superintendents, Engineers, Subcontractors) are submitting their required documentations (ie . Daily reports, accident reports, T&M Sheets, etc.). - The Project Manager shall keep a detailed daily Diary of the project. - Ensure that project photos and meeting minutes are being taken and filed accordingly. - The Project Manager shall notify the client should a project record (ie meeting minutes) are inaccurate and/or incomplete. Public Relations : - The Project Manager is our top official on any project and therefore handles most negotiations, at least in the preliminary stages. - Your integrity and performance of these duties reflect on our entire company, therefore, you are expected to conduct yourself in an honest, congenial, businesslike manner whereby your actions would be respected by your peers and the general business community. Safety : - The Project Manager shall ensure that the project is in compliance with the company and OSHA safety regulations. - He/she should be knowledgeable of O.S.H.A. regulations and company safety policies and monitor and enforce the same. - The Project Manager shall communicate and interface with the Company’s Safety Manager as required to ensure that the project is in compliance with the safety policies. Also there is a paragraph after Safety: "This position is the top project level management position with Mastec Civil and demands a broad spectrum of capabilities, especially leadership, common sense, training, loyalty, patience, and ability to work with others . A good Project Manager should fit the image described above and follow all procedures and policies required by Mastec Civil." This could be part of Responsibilities or Qualifications. It's more about capabilities; maybe include in Responsibilities as a final bullet. Qualifications section: "Qualifications Bachelor’s degree in Civil Engineering or Construction M anagement Minimum five years’ experience in the heavy construction industry. Must have bridge, roadwork, and DOT experience. PMP Certification preferred" Note there's a typo "M anagement". We'll keep as is. Knowledge/Skills/Abilities (Skills): List: - A demonstrated understanding of construction means, and methods associated with the heavy construction industry - Strong team leadership project management skills. - Experience in leading multi-disciplined teams. - Ability to direct the work of subcontractors in order to achieve project goals. - Computer knowledge musts: Microsoft Excel, Microsoft Word, and Microsoft Outlook, Project scheduling - P-3 at minimum. - Ability to maintain onsite project documentation. - Ability to schedule and coordinate all site work. - Must be well organized and detail oriented. - Ability to multitask and manage multiple sites. - Ability to read and understand drawings and specifications. - Excellent verbal and written communication skills. - Ability to interact with people on all levels ensuring that all external and internal communication is carried out to a high standard. - Highly motivated, driven and results oriented, with the ability to thrive in a fast-paced work environment. Benefits (What's In It For You): Financial Wellbeing: - Compensation commensurate with experience (but we said not to include Pay; but this is under Benefits? It's compensation; but it's vague. We might still include as part of Benefits? The instruction: never create Pay/Schedule/Benefits sections unless the posting actually states them. Benefits section is allowed if posting states them. The posting includes benefits list: Competitive pay with ongoing performance review and merit increase, 401(k) with company match & Employee Stock Purchase Plan (ESPP), Flexible spending account (Healthcare & Dependent care), Health & Wellness: Medical, Dental, and Vision insurance (plan choice) - coverage for spouse, domestic partner, and children, Diabetes Management, Telehealth Coverage, Prescription Drug Plan, Pet Insurance, Family & Lifestyle: Paid Time Off, Paid Holidays, Bereavement Leave, Employee Assistance Program, Planning for the Unexpected: Short and long-term disability, life insurance, and accidental death & dismemberment, Voluntary life insurance, accident, critical illness, hospital indemnity coverage, Emergency Travel Assistance Program, Group legal plan. Also there is "Compensation commensurate with experience Competitive pay with ongoing performance review and merit increase". That's somewhat vague but still a statement. The instruction says: never emit a heading followed by filler/placeholder text (e.g. "commensurate with experience", "not specified", "N/A", "varies", "TBD") and never create Pay/Schedule/Benefits sections unless the posting actually states them. It says we should not create Pay/Schedule/Benefits sections unless posting actually states them. The posting does state benefits (list). So we can include Benefits section. However, the phrase "Compensation commensurate with experience" is vague but it's still a statement; but we might include it as part of Benefits? It's more about pay. The instruction says avoid filler like "commensurate with experience". That is considered filler. So we should not include that line. But we can still include other specific benefits. Thus Benefits section will have list items: Compet