Jobs · OTHR · Florida

Urea Plant 300 tpd

Used Plants · Plant City, FL · 1 mo ago
OTHRFull-time

UREA Plant with a capacity of 300 mt/day, last operational in November 2008 following a major revamp in 1980.

Process & Engineering

  • Process: Montecatini
  • Original engineering: Kellogg
  • Revamp engineering: Tecnimont

Raw Materials

  • Ammonia consumption: 0.596 t/t

Equipment

  • Detailed equipment lists available (Equipment list 1, Equipment list 2)

Similar jobs