Senior Data Center Construction Project Manager
Nebius · New Jersey, United States · 4 wk ago
$115k–$275k/yrFull-time
Responsibilities
- Oversee all phases of data center construction, from design review to commissioning and handover.
- Collaborate with architects, MEP consultants, contractors, and vendors to ensure project specifications and timelines are met.
- Review design drawings and technical submittals for compliance with company standards and operational requirements.
- Manage change control, progress tracking, and budget adherence throughout the project lifecycle.
- Participate in Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT) for key systems such as UPS, chillers, generators, and switchgear.
Coordination with Authorities & Compliance
- Serve as the primary liaison with local authorities, utilities, and regulatory bodies.
- Ensure all permits, licenses, and inspections (e.g., building, fire, electrical, environmental) are completed on schedule.
- Maintain compliance with local codes, safety standards, and data center industry best practices (e.g., ISO, Uptime Institute, TIA-942).
- Manage documentation and reporting for occupancy certification and operational approvals.
Operations Readiness & Handover
- Lead commissioning activities, ensuring all systems (electrical, mechanical, BMS, security, etc.) are fully tested and validated.
- Develop and implement standard operating procedures (SOPs) and emergency operating procedures (EOPs) for facility systems.
- Train operations teams on site-specific systems, monitoring tools, and safety practices.
- Ensure smooth transition from construction to operations with full documentation and warranty records.
Facility Management & Performance
- Oversee daily facility operations, preventive maintenance, and vendor management.
- Monitor and optimize Power Usage Effectiveness (PUE) and energy efficiency.
- Implement sustainability and reliability improvements, including capacity planning and infrastructure upgrades.
- Ensure adherence to health, safety, and environmental (HSE) standards across all facility operations.