Jobs · Management · Virginia

Senior Construction Scheduler

DM Enterprises · Virginia Beach, VA · 2 mo ago
On-siteManagementFull-time

Senior Construction Scheduler focused on water and wastewater projects, responsible for developing, maintaining, and analyzing detailed baseline and master schedules using Primavera P6 and other scheduling tools.

Responsibilities

  • Develop, manage, update, and monitor individual project schedules and integrated overall master program schedule.
  • Review project documents and specifications to accurately develop baseline schedules including all required dates, activities, and milestones.
  • Perform progress schedule update reviews with comprehensive reporting and narratives.
  • Review schedule, progress, and productivity of consultants and contractors; monitor and verify monthly costs and earned value.
  • Conduct change order management and control.
  • Develop, manage, and monitor program and project-specific budgets, cash flow projections, and forecasts.
  • Handle cost and resource management and reporting.
  • Establish and ensure scheduling and cost control standards are implemented.
  • Prepare progress payment application reporting.
  • Participate in meetings with project teams, clients, owners, and stakeholders related to project controls and scheduling.
  • Develop and analyze what-if scenarios, including risk mitigation strategies and support for tracking key performance metrics (CPI, SPI, critical path, float density, variance, etc.).
  • Perform delay and time impact analysis of schedules.
  • Adhere to and verify quality standards are met within deliverables produced by the project team, consultants, and contractors.

Requirements

  • Bachelor’s Degree in Architecture, Engineering, or Construction Management.
  • 10+ years of relevant project controls or project analyst experience demonstrating increasing responsibility in project size and sophistication, preferably in wastewater.
  • PMI-SP or PSP certification highly desired (Planning and Schedule Professional).
  • Experience with advanced scheduling principles using Primavera P6, MS Project, or other related system applications.
  • Excellent verbal, communication, and interpersonal skills.
  • Proficiency with Microsoft Office, especially Word and Excel.

Benefits

  • 401(k)
  • 401(k) matching
  • Dental insurance
  • Health insurance
  • Paid time off
  • Tuition assistance
  • Vision insurance

Similar jobs