Quality Assurance PM – Electrical - Data Center Construction
Turner & Townsend · Frederick, MD · 1 wk ago
On-siteConsultingFull-time
Responsibilities
- Effectively manage and collaborate with project stakeholders.
- Effective communication across our internal team to ensure efficiency and a consistent delivery to the client.
- Analyze, track, and effectively manage critical milestone activities to avoid schedule slip.
- Verify that effective project governance, processes and systems are utilized.
- Ensure application of best practice on all projects.
- Production of formal project status reports and other reports as required.
- Monitor the progress of multiple construction projects simultaneously to ensure that the approved design standards are being applied correctly.
- Manage the interface between all suppliers through monthly trackers and weekly reviews.
- Manage the flow of project information between the project team through regular meetings and written communications.
- Forecast and update key project milestones.
- Manage and monitor local design teams in accordance with commission criteria.
- Provide technical support to owners, architects, general contractors and regional stakeholders.
- Rapid response to RFIs from the field.
- Provide expertise for cost control, value engineering, and constructability guidance where required.
- Independent review of status reports, drawing submittals, timelines and costs from architects, contractors and suppliers.
- Client management – assist in developing excellent working relationships with Clients, with a view towards maximizing new opportunities.
- Strategic Thinking - provides advice to project teams on approaches that can be adopted to successfully achieve both clients’ objectives and business objectives.
- Knowledge management – ensure that key information and learnings generated from each project is captured.
- Process improvement – Identify ways to improve internal systems and processes SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
Qualifications
- Bachelor’s degree in Electrical Engineering, Construction Management, or related field.
- Minimum 5+ years of electrical project management experience, ideally in data center construction or with an electrical contractor.
- Familiarity with substation and power distribution systems preferred.
- Strong leadership, communication, and problem-solving skills.
- Proficiency in project management tools.
- Knowledge of relevant codes, standards, and construction methodologies.
- Proficiency in the Data Center Commissioning Process (levels 1 –5).
- Proficiency managing construction documents including BODs, specifications, contract drawings, C/D/E’s, equipment submittals and RFIs.
- Proficiency in Excel, Word, PowerPoint, Outlook, Procore, P6, CxAlloy, and other construction project management tools.