Jobs · Consulting · Georgia

Quality Assurance PM, Electrical – Data Center Construction

Turner & Townsend · Atlanta, GA · 4 mo ago
On-siteConsultingFull-time

Responsibilities

  • Effectively manage and collaborate with project stakeholders.
  • Effective communication across our internal team to ensure efficiency and a consistent delivery to the client.
  • Analyze, track, and effectively manage critical milestone activities to avoid schedule slip.
  • Verify that effective project governance, processes and systems are utilized.
  • Ensure application of best practice on all projects.
  • Production of formal project status reports and other reports as required.
  • Monitor the progress of multiple construction projects simultaneously to ensure that the approved design standards are being applied correctly.
  • Manage the interface between all suppliers through monthly trackers and weekly reviews.
  • Manage the flow of project information between the project team through regular meetings and written communications.
  • Forecast and update key project milestones.
  • Manage and monitor local design teams in accordance with commission criteria.
  • Provide technical support to owners, architects, general contractors and regional stakeholders.
  • Rapid response to RFIs from the field.
  • Provide expertise for cost control, value engineering, and constructability guidance where required.
  • Independent review of status reports, drawing submittals, timelines and costs from architects, contractors and suppliers.
  • Client management – assist in developing excellent working relationships with Clients, with a view towards maximizing new opportunities.
  • Strategic Thinking - provides advice to project teams on approaches that can be adopted to successfully achieve both clients’ objectives and business objectives.
  • Knowledge management – ensure that key information and learnings generated from each project is captured.
  • Process improvement – Identify ways to improve internal systems and processes SOX control responsibilities may be part of this role, which are to be adhered to where applicable.

Qualifications

  • Bachelor’s degree in Electrical Engineering, Construction Management, or related field.
  • Minimum 5+ years of electrical project management experience, ideally in data center construction or with an electrical contractor.
  • Experience with substation and power distribution systems preferred.
  • Familiarity with MEP design.
  • Strong leadership, communication, and problem-solving skills.
  • Proficiency in project management tools.
  • Knowledge of relevant codes, standards, and construction methodologies.
  • Proficiency in the Data Center Commissioning Process (levels 1 –5).
  • Proficiency managing construction documents including BODs, specifications, contract drawings, C/D/E’s, equipment submittals and RFIs.
  • Proficiency in Excel, Word, PowerPoint, Outlook, Procore, P6, CxAlloy, and other construction project management tools.

Similar jobs