Jobs · Engineering · California

Prototype Engineering Lead

Change Order · San Jose, CA · 3 mo ago
Engineering$2k/moFull-time

About the role

The prototyping division at Etched’s 80,000 square foot Milpitas facility will be stood up. This includes a quick-turn machine shop and sheet metal cell, a system assembly and integration area, and a prototype SMT line. The goal is to enable any Etched engineer to get a prototype part made with same-day or next-day turnaround.

Key Responsibilities

  • Own the end-to-end stand-up of the prototyping division: space planning, equipment selection and procurement, facility improvements, permits, and commissioning of the machine shop, sheet metal cell, assembly area, and prototype SMT line
  • Hire, lead, and develop a team of machinists, fabricators, and assembly technicians
  • Run day-to-day operations against the division's core metric: same-day or next-day turnaround on prototype parts for engineering
  • Build the systems that make a shop run: work intake and prioritization, quoting, scheduling, traceability, inventory and vendor-managed consumables, and preventive maintenance
  • Own the division budget (capex and opex), make build-vs-buy calls, and manage relationships with machine dealers, riggers, and overflow vendors
  • Stand up quality infrastructure: first-article inspection, calibration program, cross-section/failure-analysis lab, and inspection criteria for incoming and in-process work
  • Partner daily with mechanical, electrical, and thermal engineering teams to close design-for-manufacturability feedback loops and pull schedules in

Requirements

  • Bachelor's degree in mechanical engineering, manufacturing engineering, industrial engineering, or other engineering discipline; OR 4+ years of professional experience in manufacturing or prototype operations in lieu of a degree
  • 3+ years of experience in manufacturing, machine shop, or hardware prototyping operations
  • 2+ years of experience directly leading technicians, machinists, or manufacturing teams
  • Hands-on experience with CNC machining and/or sheet metal fabrication processes
  • Strong candidates may also have experience standing up a machine shop, prototype lab, or manufacturing line from an empty floor: equipment selection, rigging, utilities, and permits
  • Experience with PCBA/SMT NPI processes (stencil printing, pick and place, reflow, AOI, X-ray, rework)
  • Experience with liquid-cooled systems, server/rack-scale hardware, or data center equipment assembly and test
  • Familiarity with California manufacturing compliance: Cal/OSHA, CUPA/HMBP hazmat programs, BAAQMD air permits, wastewater discharge
  • Experience implementing ERP/MES or lightweight traceability systems in a job-shop or NPI environment
  • Ability to personally run a mill, brake, or lathe when the queue demands it
  • Experience in a high-growth startup or program-driven environment (aerospace, automotive, consumer hardware NPI)
  • Track record of hiring and retaining skilled trades talent in a competitive market

How We’re Different

Etched believes in the Bitter Lesson. We are the first inference-focused frontier AI system, betting early on transformer and transformer-like architectures and on increasing model sizes. Our addressable market is the entirety of inference, unlike many of our competitors. We are a fully in-person team in San Jose (Santana Row), and greatly value engineering skills. We do not have boundaries between engineering and research, and we expect all of our technical staff to contribute to both and work across disciplines as needed.

Similar jobs

Prototype Engineer

U.S. Fusion EnergyEnergy, IL· 3 wk ago
Information Technology$240/hrapply on fusionenergybase.com

Prototype Engineer

Observable SpaceLos Angeles, CA· 2 mo ago
Information Technology$95k–$130k/yrapply on jobs.ashbyhq.com

Prototype Engineer

Alumni FoundersLos Angeles, CA· 2 mo ago
Engineering$95k–$130k/yrapply on jobs.ashbyhq.com