Jobs · Engineering · California

Physical Design Engineer - Block Level, Subsystem Implementation

Change Order · San Jose, CA · 2 mo ago
Engineering$2k/moFull-time

About the role

As a Physical Design Engineer at Etched, you will be responsible for owning block-level implementation from synthesis through GDSII sign-off. Your role includes driving block-level and subsystem PPA optimization, collaborating closely with RTL designers, and providing actionable feedback to ensure iterative speed in bringing products to market.

Key Responsibilities

  • Own block-level and/or subsystem physical design end to end, including floorplanning, synthesis, placement, clock tree synthesis, and routing through GDSII.
  • Drive block-level timing closure across all corners and modes, including constraint development, STA debug, and functional and timing ECO implementation.
  • Close block-level signoff across EM, IR drop, RC extraction and correlation, and physical verification (DRC, LVS, antenna).
  • Generate abstracts, views, and timing budgets for clean hierarchical integration of your blocks into the top level.
  • Collaborate with RTL Designers and provide Physical Design feedback to improve PPA.
  • Continuously improve the PPA of owned blocks and contribute learnings back into the shared RTL-to-GDSII flow.
  • Supervise physical design work outsourced to 3rd party services and be accountable for the quality and closure of delivered blocks.

Qualifications

  • 5-10+ years of previous experience with PDTools, flow, and design methodology from RTL synthesis to GDSII sign-off.
  • Experience with back-end design and timing closure on advanced process nodes (5nm and below).
  • Experience with Cadence (Innovus, Genus) or Synopsys (Fusion Compiler) automated RTL-to-GDSII flows.
  • Experience with sign-off tools (PrimeTime, Tempus, Voltus, etc.).
  • Experience with UPF-based low power design methodology, power verification, synthesis, scan insertion/ATPG, formal verification, floorplanning, placement, CTS, routing, IR drop, and EM/antenna analysis.
  • Scripting ability in Tcl, Python, or Perl for flow automation and debug.
  • Strong candidates may also have experience with modern ML and LLM model architectures, programming with Python or another scripting language, and familiarity with AI tools for programming/coding.

Skills

  • Deeply creative and able to think from first principles.

Benefits

  • Medical, dental, and vision packages with generous premium coverage.
  • $500 per month credit for waiving medical benefits.
  • Housing subsidy of $2k per month for those living within walking distance of the office.
  • Relocation support for those moving to San Jose (Santana Row).
  • Variety of wellness benefits covering fitness, mental health, and more.
  • Daily lunch and dinner in our office.
  • Unlimited compute budget subject to ROI justification.

How We’re Different

Etched believes in the Bitter Lesson. We are the first inference-focused frontier AI system, betting early on transformer and transformer-like architectures and on increasing model sizes. Our addressable market is the entirety of inference, unlike many of our competitors. We are a fully in-person team in San Jose (Santana Row), and greatly value engineering skills. We do not have boundaries between engineering and research, and we expect all of our technical staff to contribute to both and work across disciplines as needed.

Similar jobs