Jobs · Manufacturing

MOP Analyst – Data Center Construction

Amentum · Philadelphia, PA · 2 mo ago
RemoteRemoteManufacturingFull-time

Amentum’s Telecommunications Group has been at the forefront of creating a new generation of wireless communication infrastructure for over 40 years. We specialize in network development, complete telecom life-cycle solutions, site acquisition, design, construction, operations, maintenance, and deconstruction. We also support clients in data center construction and operations by combining expertise in cloud migration, infrastructure management, and mission-critical systems to ensure resilient, scalable, and secure environments that meet hyperscale expansion demands.

About the role

We are seeking a Method of Procedure (MOP) Analyst for an ongoing construction project. The ideal candidate will bring strong project management skills, expertise in electrical and mechanical systems, vendor/contractor coordination, and the ability to integrate IT infrastructure requirements with construction delivery. This role ensures safe, compliant, and well-coordinated execution of multi-disciplinary project work while maintaining hyperscale clients' operational standards. Candidates should have a strong understanding of mechanical, electrical, and plumbing (MEP) systems and experience working in complex, fast-paced environments.

Responsibilities

  • Create and review Method of Procedure (MOP) documents based on site design documents.
  • Review and redline construction documents, including engineering drawings, electrical and plumbing diagrams, and structured cabling.
  • Coordinate with counterparts and clients in the USA, providing daily project progress updates.
  • Maintain and enforce the organization’s safety program, ensuring daily job site safety plans are reviewed and followed; stop work when unsafe practices or conditions exist.
  • Ensure timely reporting of all staff, subcontractor, and safety incidents.
  • Oversee the project’s construction design and projected schedule.
  • Communicate project changes to the client and collaborate with the Project Manager and other Construction Managers on implementation.
  • Comply with and enforce the quality program for the company and subcontractors’ work, ensuring all quality standards meet customer specifications.
  • Interpret and verify industry standards, guidelines, and codes for project deliverables.
  • Schedule and monitor work plans consistent with agreements.
  • Act as a key interface with construction and project teams, logistics, and general contractors.
  • Understand local building codes, environmental regulations, and compliance frameworks.
  • Implement technical project requirements and assist others in accomplishing the same.
  • Prepare standard discipline deliverables, including work processes and tools.
  • Maintain documentation, weekly updates, and communication through project management tools (e.g., Procore, MS SharePoint, Excel).

Requirements

  • Recognized bachelor’s degree in engineering (preferably Electrical or Instrumentation) from an accredited college or university.
  • 6+ years of industry experience, preferably in data center and infrastructure construction; prior direct employment with a data center is an advantage.
  • Working knowledge of interaction between disparate low-voltage systems (BMS, EPMS, Fire Alarm).
  • Proficiency in MS SharePoint, Word, Excel, Outlook, Project, Teams, Visio, and CAD drawings.
  • Ability to read and interpret construction drawings.
  • Experience in data center/HUB construction planning.
  • Construction trade knowledge (Electrical/Plumbing/Mechanical).
  • Experience ensuring a safe working environment.
  • Experience working in high-volume environments.
  • Experience in process documentation development.
  • Experience working in a collaborative team environment.
  • OSHA 10 Certification (optional).
  • Excellent oral and written communication skills.
  • Ability and willingness to travel to project sites.

Key Attributes

  • Ownership mindset: Ability to drive decisions and manage conflicts with minimal supervision.
  • High attention to detail.
  • Strong communication skills.
  • Ability to take direction.
  • Excellent analytical, quantitative, written, and presentation skills.

Pay

$80,000 – $100,000 per year. Actual compensation may vary based on factors such as job responsibilities, education, experience, skills, internal equity, market data, applicable collective bargaining agreements, and relevant laws.

Benefits

  • Health, dental, and vision insurance.
  • Paid time off and holidays.
  • Retirement benefits (including 401(k) matching).
  • Educational reimbursement.
  • Parental leave.
  • Employee stock purchase plan.
  • Tax-saving options.
  • Disability and life insurance.
  • Pet insurance.

Note: Benefits may vary based on employment type, location, and applicable agreements. Positions governed by a Collective Bargaining Agreement (CBA), the McNamara-O'Hara Service Contract Act (SCA), or other employment contracts may include different provisions/benefits.

Similar jobs

Data Analyst

TransNort Transporte de PersonalMinnesota, United States· 1 mo ago
RemoteAnalyst$74k–$84k/yrapply on tally.so

Data Analyst

Hustle Notice BizMichigan, United States· 1 mo ago
RemoteAnalyst$73k–$83k/yrapply on tally.so

Data Analyst

McLeod SoftwareBirmingham, AL· 3 mo ago
apply on recruiting2.ultipro.com

Data Analyst

CACI International IncColorado Springs, CO· 3 mo ago
OTHR$75k–$158k/yrapply on searchcareers.caci.com

Data Analyst

A.P. Moller - MaerskCinnaminson, NJ· 3 mo ago
Information Technology$60k–$65k/yrapply on maersk.wd3.myworkdayjobs.com

Data Analyst

Infinite Computer SolutionsCalifornia, United States· 4 mo ago
Information Technologyapply on sjobs.brassring.com