Master Electrician – Data Center Construction
Archetype Infrastructure Solutions · Phoenix, AZ · 3 mo ago
On-siteManagement$10/hrFull-time
Position Summary
We are seeking an experienced Master Electrician with a strong background in data center construction, commissioning, and mission-critical infrastructure. This individual will lead electrical installations, oversee field teams, ensure compliance with electrical codes and safety standards, and support the successful delivery of complex data center projects.
Key Responsibilities
- Lead and supervise electrical installation activities on data center construction projects.
- Interpret electrical drawings, specifications, and project plans.
- Oversee Installation Of Medium- and low-voltage power distribution systems
- Switchgear and switchboards
- Transformers
- UPS systems
- Backup generators
- PDUs and RPPs
- Grounding and bonding systems
- Loading and branch power systems
- Cook up with project managers, engineers, commissioning teams, and subcontractors.
- Ensure compliance with NEC, local electrical codes, OSHA regulations, and company safety standards.
- Perform quality control inspections and troubleshoot electrical systems.
- Support startup, testing, commissioning, and energization activities.
- Mentor and supervise journeyman electricians, apprentices, and electrical foremen.
- Maintain project schedules and ensure work is completed on time and within budget.
Required Qualifications
- A current Master Electrician License (state or local jurisdiction as applicable).
- 8+ years of commercial or industrial electrical experience.
- 3+ years of experience supporting data center, mission-critical, or large-scale industrial projects.
- Strong knowledge of NEC and electrical safety regulations.
- Experience working with medium-voltage systems, switchgear, generators, UPS systems, and critical power infrastructure.
- Ability to read and interpret electrical drawings, one-line diagrams, and specifications.
- OSHA 30 certification or willingness to obtain.
- Ability to lift equipment, climb ladders, and work in industrial environments.
Preferred Qualifications
- Data center construction experience with hyperscale or colocation facilities.
- Experience supporting commissioning and turnover activities.
- NFPA 70E certification.
- Medium-voltage switching and maintenance experience.
- Experience leading electrical crews on projects exceeding $10M in value.
- Familiarity with mission-critical environments requiring high reliability and uptime.
Key Skills
- Electrical troubleshooting
- Critical power systems
- Team leadership
- Project coordination
- Commissioning support
- Safety compliance
- Quality assurance
- Communication and problem-solving
Work Environment
Active construction sites and mission-critical facilities. Ability to work extended hours, weekends, and travel as project needs require. Must be able to lift equipment, climb ladders, and work in industrial environments.