MARCELLO V
Teasdale Fenton of Columbus · Columbus, OH · 3 days ago
OTHRFull-time
Why did the customer contact us?
The customer engaged our services for a professional "put back" or reconstruction phase following the completion of water damage mitigation. The project required restoring the affected areas to their pre-loss condition, specifically focusing on finishing the drywall installation, mudding, taping, and texturing to ensure a seamless aesthetic match with the existing structure.
Solutions Provided
- Installed new, moisture-resistant drywall panels across the affected wall cavities
- Executed professional-grade mudding, taping, and sanding to create a smooth, level finish
- Matched the wall textures and prepared the surfaces for painting
- Carefully protected the surrounding flooring and fixtures throughout the build-back process