Loader II - 2nd Shift
Crystal Cabinet Works · Princeton, MN · 2 wk ago
Management$20.2–$24.4/hrFull-time
Schedule And Pay
- 2nd Shift: Monday-Thursday 3:00 PM - 1:15 AM
- Friday & Saturday OT required as needed
- Salary Grade D: $20.20 - $24.40
- Additional $1.00 Paint Pay
- Additional $2.00 Shift Differential
Job Summary
The Loader II is responsible for loading product, testing, troubleshooting and cleaning finishing lines to assure efficient processing on a multiple coatings production line.
Job Duties
- Starts computers for automated finishing lines (primer, enamels, topcoat, etc.) and assures that all is correct and adjusts as needed.
- Troubleshoots any problems on finishing lines i.e., dirty sensors, dirty or misaligned spray tips, etc.
- Covers incoming work according to production and orders finish materials in a timely manner.
- Prepares cleaning carts for belt cleaning and locks in.
- Cleans spray gun tips and installs in booth.
- Reviews paperwork and determines which finishes are needed as well as orders them throughout the shift.
- Flushes pumps and lines as well as clean tips as needed to ensure efficient production.
- Completes process sheets for jobs.
- Runs tests at the beginning of shift and adjusts as necessary.
- Conducts QC operations to ensure finish within specification (mil check, oven temperature, etc.).
- Loads belt appropriately per order with starting and ending blocks.
- Inspects components for flaws and fixes if possible or sends out for repair.
- Runs rework through finishing lines as needed.
- Cleans machines and assists with maintenance as needed.
- Maintains a working knowledge of the various wood species and paint colors and can differentiate between them.