Jobs · Management

Data Center Construction Quality Assurance & Quality Control (QA/QC)

Oracle · United States · 2 wk ago
RemoteRemoteManagement$102k–$210k/yrFull-time

Responsibilities

  • Lead QA/QC oversight for data center construction activities across assigned projects or campuses.
    • Ensure construction work is performed in accordance with approved drawings, specifications, codes, standards, project requirements, and OCI quality expectations.
    • Develop, implement, and manage project-specific quality plans, inspection processes, quality checklists, and audit routines.
    • Review contractor QA/QC plans, inspection test plans, method statements, material submittals, and quality procedures.
    • Establish clear quality expectations with general contractors, trade partners, vendors, and internal project teams.
    • Promote a culture of quality ownership, early issue identification, and continuous improvement across the project site.
  • Conduct field inspections to verify installation quality across architectural, civil, structural, mechanical, electrical, low-voltage, controls, and related data center systems.
    • Validate that installed work aligns with approved shop drawings, specifications, manufacturer requirements, and project standards.
    • Monitor critical construction activities, including equipment installation, cable pathways, piping, containment, grounding, firestopping, penetrations, labeling, access control, and system integration points.
    • Identify quality defects, installation issues, incomplete work, and risks to commissioning or operational readiness.
    • Track corrective actions through closure and verify that rework meets required standards.
    • Support walkdowns, punch list development, system readiness reviews, and turnover inspections.
  • Manage contractor and vendor quality performance.
    • Hold general contractors, subcontractors, suppliers, and vendors accountable for quality performance.
    • Review contractor quality metrics, inspection results, non-conformance trends, rework items, and documentation status.
    • Lead quality meetings with contractors and trade partners to review open issues, upcoming inspections, recurring defects, and corrective actions.
    • Escalate quality risks that may affect schedule, cost, commissioning, safety, or operational turnover.
    • Partner with procurement, construction, and commercial teams to evaluate vendor performance and support resolution of quality-related disputes.
    • Ensure vendor-provided materials, equipment, and assemblies meet approved submittals, specifications, and manufacturer requirements.
  • Manage non-conformance, defect, and corrective action.
    • Manage non-conformance reports, quality observations, deficiency logs, and corrective action plans.
    • Perform root cause analysis for recurring quality issues and drive preventive actions.
    • Ensure defects are properly documented, assigned, prioritized, and resolved before system acceptance or turnover.
    • Review contractor responses to quality issues and validate that proposed corrective actions are technically sound.
    • Track trends in rework, failed inspections, incomplete documentation, and installation defects.
    • Use quality data to improve contractor accountability, field execution, and future project standards.
  • Ensure project quality records are complete, accurate, and organized for turnover to commissioning and operations teams.
    • Support commissioning readiness by verifying that systems are installed, inspected, tested, labeled, and documented before commissioning activities begin.
    • Partner with commissioning teams to resolve quality issues identified during pre-functional testing, functional testing, integrated systems testing, and operational readiness reviews.
    • Ensure punch list items and quality defects are closed before final acceptance.
    • Support smooth handover from construction to operations by ensuring quality documentation meets OCI expectations.
  • Support design, standards, and constructability.
    • Review project drawings, specifications, and design packages for quality risks, constructability concerns, missing details, and potential field conflicts.
    • Provide feedback to design and engineering teams based on field quality trends and lessons learned.
    • Support development and refinement of OCI quality standards, inspection templates, construction checklists, and delivery playbooks.
    • Ensure lessons learned from active projects are captured and incorporated into future designs, scopes, and contractor requirements.
    • Partner with cross-functional teams to improve installation consistency, maintainability, and operational reliability.
  • Communicate and report.
    • Provide regular QA/QC status updates to project leadership, construction managers, commissioning teams, and senior stakeholders.
    • Report on quality performance, open defects, non-conformance trends, inspection results, documentation status, and turnover readiness.
    • Communicate complex quality issues clearly and professionally to both technical and non-technical audiences.
    • Support executive-level reporting on major quality risks, contractor performance, project readiness, and mitigation plans.
    • Maintain accurate quality dashboards, logs, reports, and action trackers.

Requirements

  • Strong experience in construction QA/QC, facilities development, mission-critical infrastructure, data centers, industrial facilities, or large-scale capital projects.
  • Solid understanding of construction quality processes, inspection procedures, non-conformance management, corrective action tracking, and turnover documentation.
  • Working knowledge of mechanical, electrical, plumbing, fire protection, controls, low-voltage, architectural, civil, and structural systems in complex facilities.
  • Experience managing contractor and vendor quality performance on active construction sites.
  • Ability to identify quality risks, installation defects, incomplete work, and documentation gaps before they affect commissioning or operations.
  • Strong communication skills with the ability to work effectively with field teams, engineers, construction managers, vendors, and senior stakeholders.
  • Demonstrated ability to manage multiple priorities in a fast-paced construction environment.
  • Strong attention to detail, sound judgment, and the ability to drive issues to closure.
  • Bachelor’s degree in Construction Management, Engineering, Architecture, Facilities Management, or a related field, or equivalent practical experience.
  • Ability to travel as required to support project delivery, site inspections, quality reviews, and vendor engagement.

Qualifications

  • Experience supporting hyperscale data center construction or other mission-critical facilities.
  • Experience with commissioning readiness, integrated systems testing, operational turnover, and closeout documentation.
  • Familiarity with quality management systems, inspection software, punch list tools, document control platforms, and construction management systems.
  • Knowledge of ISO 9001 quality principles, construction audit practices, and formal quality management processes.
  • Experience with AI infrastructure, high-density data halls, GPU deployments, liquid-cooled environments, or large-scale cloud infrastructure projects.
  • Professional certifications such as CQM, CQE, PMP, LEED, OSHA, RCDD, BICSI, ASQ, or related credentials.
  • Experience working with general contractors, EPC firms, trade contractors, equipment vendors, commissioning agents, and owner’s representatives.
  • Strong understanding of data center operational requirements and how construction quality affects reliability, maintainability, and uptime.

Similar jobs