Construction Scheduler - Short-Term
APSI Construction Management · Atlanta, GA · 1 mo ago
On-siteManagement$70–$100/hrContract
Location: Atlanta, GA (exact site confidential, disclosed during interview)
Pay Range: $170‑200k/year plus benefits
Client: Federal Government
Project Name: Brownfield Manufacturing Facility Renovation/Expansion
Project Duration: 6–8 weeks, with potential for extension
Anticipated Start Date: September 2026
Project Details
This role supports a $70–$100 M brownfield manufacturing facility project in Atlanta, GA, currently in the early construction and demolition phase, with a significant focus on MEP systems. The scope and duration of the work are subject to change.
Responsibilities
- Develop the Integrated Master Schedule (IMS) baseline.
- Engage with project stakeholders to collect necessary information for IMS development.
- Validate alignment between the Client’s and Design‑Builder’s critical milestones.
- Identify missing or circular logic between activities.
- Verify the critical path and ensure critical milestones align with contract requirements and key dates.
- Flag major constraints such as labor, equipment availability, and supply‑chain disruption.
- Assess contingency and float risk, and recommend optimization or acceleration options.
- Establish an IMS Management Plan outlining the process of updating, analyzing, and reporting on the IMS.
- Manage the IMS according to the Schedule Management Plan.
- Train the Client’s internal scheduler on schedule development and updating processes.
Deliverables
- A1: Integrated Master Schedule – comprehensive baseline schedule (MS Project) that aligns critical milestones from the Client, Design‑Builder, and other third‑party stakeholders, to be used by the Client’s internal scheduler.
- A2: Basis of Schedule – detailed report explaining the rationale, logic, assumptions, constraints, risks, and critical activity dependencies driving the IMS.
- A3: Schedule Management Plan – detailed process flow for collecting schedule data, updating the schedule, and distributing critical information to key project stakeholders.
Required Qualifications
- U.S. citizenship (required by Department of Defense regulations).
- 8+ years of related scheduling experience.
Preferred Qualifications
- Bachelor’s degree in Civil Engineering, Construction Management, or a related field.
- Experience with manufacturing plant construction or large campus‑style projects.