Jobs · Manufacturing · Utah

Construction Scheduler/Planner

Quanta Infrastructure Solutions Group · Eagle Mountain, UT · 3 mo ago
On-siteManufacturingFull-time

About the role

QISG is seeking a Project Scheduler to support a 286MW simple-cycle power generation project in Eagle Mountain, Utah. This construction-focused role will support project execution by developing and maintaining Primavera P6 schedules, tracking progress, analyzing risks, and partnering with Engineering, Procurement, Construction, and Project Management teams.

Responsibilities

  • Develop and maintain Linear Schedule Method (LSM) and Critical Path Method (CPM) schedules using Primavera P6.
  • Create, baseline, update, and analyze cost- and resource-loaded schedules to support successful project execution.
  • Collaborate with Engineering, Procurement, Project Controls, Project Management, suppliers, and trade partners to align schedules with project goals.
  • Integrate Work Breakdown Structure (WBS) and Financial Breakdown Structure (FBS) to support cost tracking and project performance.
  • Track earned value metrics (EVM), KPIs, cash flow curves, and schedule performance to identify risks and trends.
  • Perform schedule analysis, time impact analysis, and support recovery planning to maintain project milestones.
  • Generate schedule reports, dashboards, and project updates for leadership and stakeholders.
  • Independently manage project scheduling activities while ensuring compliance with QISG project controls standards.

Requirements

  • 8+ years of experience developing and managing resource- and cost-loaded schedules for EPC, utility, heavy industrial, or large-scale construction projects.
  • Strong understanding of earned value management (EVM), schedule performance metrics, and project controls principles.
  • Advanced proficiency with Primavera P6 required.
  • Experience with TILOS, Acumen, or other project controls software is a plus.
  • Experience collaborating with design, permitting, procurement, construction, and commissioning teams to support project execution.
  • Strong communication skills with the ability to work effectively across all levels of the organization.
  • Self-motivated with excellent time management, organization, and attention to detail.
  • High school diploma or equivalent required; Bachelor’s degree in Engineering, Construction Management, Business Administration, or related field preferred.
  • Ability to work onsite approximately 75% of the project duration.

Qualifications

  • Power generation experience is preferred but not required; strong EPC, utility, or heavy industrial construction scheduling experience is essential.

Skills

  • Advanced proficiency with Primavera P6.
  • Experience with TILOS, Acumen, or other project controls software.
  • Strong collaboration and communication skills.
  • Time management and organizational skills.

Benefits

  • Full medical, dental, and vision coverage.
  • 401(k): Company match included.
  • Paid Time Off.

Similar jobs