Jobs · Business Development · Texas

Construction Scheduler I - Construction Scheduler I

EPITEC · Austin, TX · 2 wk ago
Business Development$81/hrContract

About the role

We are seeking a highly skilled CSA (Civil, Structural & Architectural) Superintendent to lead all civil, structural, and architectural field operations on large-scale, fast-paced design-build construction projects within the advanced manufacturing sector. This individual will be the senior field leader responsible for site development, foundations, structural steel and concrete systems, building envelope, and architectural finishes — ensuring these critical-path activities are executed safely, on quality, and ahead of schedule to enable downstream MEP and process equipment installations. The ideal candidate has a proven track record of delivering the structural backbone of complex industrial facilities — including semiconductor fabrication plants, battery manufacturing facilities, pharmaceutical campuses, and data centers — in compressed, design-build schedules where early structural turnover is essential to project success.

Reports to: SR Manager of Construction. Direct Reports: Area Superintendents (Civil/Structural), Concrete Foremen, Steel Erection Leads, Architectural Foremen, Field Engineers, CSA Trades.

Responsibilities

  • Civil & Sitework Leadership: Direct all earthwork, grading, utilities, paving, and site infrastructure activities; manage mass excavation, dewatering, and soil stabilization operations for large industrial sites.
  • Structural Concrete: Oversee all foundation systems (mat foundations, deep foundations, piers), elevated slabs, tilt-wall panels, and cast-in-place concrete operations including formwork, rebar placement, embed coordination, and concrete placement/finishing.
  • Structural Steel Erection: Manage structural steel erection sequences, including heavy crane planning, connection inspections, bolt-up/torquing, and coordination with steel fabricators and erectors to maintain erection schedules.
  • Building Envelope: Coordinate exterior wall systems (metal panels, curtain wall, precast), roofing, waterproofing, and building enclosure to achieve weather-tight milestones critical for interior MEP and process work.
  • Architectural Finishes: Oversee interior architectural construction including partitions, ceilings, flooring, painting, and specialty finishes required in controlled manufacturing environments.
  • Design-Build Coordination: Collaborate with structural and civil engineers during design development to provide constructability input, sequence recommendations, and early identification of long-lead items.
  • Schedule Execution: Drive structural milestones through proactive planning, look-ahead development, and daily coordination; manage critical path activities that gate downstream trades.
  • Crane & Heavy Lift Planning: Develop and oversee crane utilization plans, heavy lift sequences, and rigging operations for structural steel, precast, and heavy equipment placement.
  • Safety Leadership: Enforce safety programs specific to high-risk CSA activities including steel erection, crane operations, excavation/trenching, concrete pumping, and working at heights.
  • Quality Assurance: Manage structural QA/QC programs including concrete testing, steel connection inspections (bolting/welding), survey control, and third

Similar jobs

Construction Scheduler I

Henderson Building SolutionsLenexa, KS· 4 mo ago
Project Managementapply on jobs.dayforcehcm.com

Construction Scheduler

WSP in the U.S.Corpus Christi, TX· 1 mo ago
Managementapply on emit.fa.ca3.oraclecloud.com