Complete Naphtha Cracker – 800KT
Used Plants · Complete, MS · 3 days ago
OTHRFull-time
Nameplate capacity: 300,000 t/y (feed gasoil), 260,000 t/y (feed VN IQ120) (1 compression line) (822 t/d × 365 d/y). Energetic index: 7,200 Kcal/Kg ethylene (1 compression line).
Facilities & Equipment
- Furnaces:
- 4 Selas furnaces, duty 43×10⁶ Kcal/h
- 5 Foster Wheeler furnaces, duty 15×10⁶ Kcal/h
- 2 Foster Wheeler ethane-recycle furnaces, duty 15×10⁶ Kcal/h
- Feedstocks:
- Gasoil 32 %
- Virgin naphtha 54 %
- Raffinate 13 %
- LPG/C5 aromatics cut 1 %
- Condensate (on availability)
- Charge-gas compressor
- Medium-temperature section
- Depropanation column
- Caustic tower (caustic concentration 4 %, consumption 2 kg/t ethylene)
- Cold section with Süd-Chemie catalyst G58C
- Ethylene chilling cycle with propylene compressor C1 (electric driver, 14 MW, 260,000 t/y ethylene)
- Compressor C6 (turbine driver, 14 MW, 186,000 t/y ethylene)
- Light-ends splitter:
- Column run length: 1,500 days
- Reboiler run length: 200 days
- Ethylene splitter (start-up 1986, capacity 300,000 t/y ethylene)
- Acetylene reactors:
- Inlet temperature: 50 °C (I), 60 °C (II)
- End-of-run temperature: 60 °C (I), 70 °C (II)
- Regeneration cycle: 210 days
- Molar ratio: 1.1 (I), 1.7 (II)
- MAPD reactors:
- Catalyst: CCI C-31
- Inlet temperature: 75 °C
- Regeneration cycle: 4 years
- Catalyst life: 28 years
- Compressor C3 (turbine driver)
- Compressor C8 (electric driver, 3.5 MW)
- Compressor C2 (back-pressure turbine CT-2A, 9 MW, suitable for one compression line)
- Compressor C7 (condensing turbine CT-7, 10.5 MW, suitable for two compression lines)
Complete naphtha cracker (start-up 2006).