BIM Integrator
LotusWorks · Boise, ID · 3 wk ago
On-siteOTHRFull-time
Responsibilities
- Collaborate with Construction Managers and the Scheduling team to coordinate the timing of model component delivery, ensuring alignment with fabrication and delivery schedules per the construction sequencing plan.
- Work alongside Field Supervision and QA teams to conduct training on model-to-field alignment and review installed conditions against model content, reporting any misaligned instances.
- Deliver technical training to the project team on model-based construction practices, including the use of Navisworks Simulate software.
- Partner with project Cost Estimators to support and train on model-based quantification workflows.
- Support clash detection, quantity take-off, and 4D scheduling activities using Navisworks Manage modules as required.
- Assist with the adoption and use of collaboration platforms such as BIM 360 and Procore across project teams.
- Contribute to the use of augmented reality tools and photogrammetry workflows where applicable to support field verification and coordination.
- Assist with any other duties or responsibilities that may be assigned to you in your role.
Qualifications
- 4–7 years’ experience in the architectural, engineering, or construction (AEC) industry.
- Demonstrated experience in a BIM coordination or VDC role on active construction projects.
- Prominent ability to deliver technical training and support cross-functional teams in the adoption of model-based workflows.
- Intermediate to advanced proficiency in Autodesk Navisworks Simulate and Navisworks Manage, including Clash Detective, QTO, and Timeliner modules.
- Experience with BIM 360 and other file sharing and collaboration platforms, including Procore.
- Strong knowledge of Virtual Design and Construction (VDC) methods and digital fabrication workflows.
- Excellent verbal, written, and electronic communication skills, with the ability to convey technical concepts clearly to diverse project teams.
- Experience with construction scheduling, material procurement, logistics management, and/or field quality review and reporting.
- Familiarity with augmented reality tools such as Microsoft HoloLens and/or photogrammetry workflows is advantageous.
- Ability to work a flexible schedule including extended overtime or off-shift hours to accommodate changing construction sequences.