Applied AI Engineer, Manufacturing & Operational Execution
Change Order · San Jose, CA · 1 wk ago
Engineering$2k/moFull-time
About the role
You will embed with Platform, Production, Supply Chain, Finance, and manufacturing partners to build the agentic systems that make those decisions faster and better. You will own the development of agentic systems that loop signal to execution: understanding what Etched needs to manufacture and deliver; modelling production plans and scenarios; triaging changes and the unexpected; capturing decisions in the systems we execute through - and designing agents that augment and scale our teams.
Key Responsibilities
- Build, deploy, and operate AI systems that run S&OP, material planning, build readiness, manufacturing partner execution, quality, logistics, and customer deployments.
- Embed with Platform, Production, Supply Chain, Finance, and other teams to identify high-leverage decisions, turn them into executable workflows augmented by agentic systems, and own outcomes.
- Build operational models connecting demand, product configurations, revisions, BOMs, supply, inventory, cost, capacity, builds, tests, quality, and shipments.
- Build agents that craft executable plans considering demand, supply, capacity, inventory, capital, schedules, and risk - and keep those plans current as constraints change.
- Propagate design changes through material exposure, sourcing, cost, factory and test readiness, production schedules, and delivery commitments.
- Design production and quality agents that coordinate clear-to-build, work in progress, bottlenecks, testing, excursions, genealogy, containment, root-cause analysis, and corrective action.
- Build historical replays and live evals tied to operating outcomes including forecast quality, schedule attainment, inventory, cost, yield, throughput, and resolution time.
- Continuously evaluate frontier models and system optimization methods.
Qualifications
- A track record of solving hard problems across stacks and domains.
- You enjoy being dropped into unfamiliar territory and figuring it out.
- Comfort with Python and code: you can read it, modify it, debug it, and direct AI to write it well. We do not care whether you write code from scratch. We care whether you ship things that work.
- Fluency using AI to learn and ramp on new problems; agentic coding tools, deep research, and frontier models are how you work, not an add-on.
- Hands-on experience building and shipping LLM-based agents or AI tooling that real users depend on (beyond just calling an API - context engineering, tool integration, orchestration, failure analysis).
- An eval-driven mindset: you measure whether AI systems actually work before scaling them.
- High agency and comfort with ambiguity. You can find the problem, not just solve the stated one.
- Worked in complex hardware, manufacturing, supply chain, S&OP, operations research, or enterprise planning, ideally through periods of hyperscale.
Skills
- Python and code proficiency.
- Experience with AI and AI tooling.
- Experience with ERP/MRP, PLM, MES, and QMS.
- Experience with BOMs and ECOs, NPI and ramp, factory test, or quality systems.
- Experience with forecasting, constraint optimization, simulation, or digital twins.
Benefits
- Medical, dental, and vision packages with generous premium coverage.
- $500 per month credit for waiving medical benefits.
- Housing subsidy of $2k per month for those living within walking distance of the office.
- Relocation support for those moving to San Jose (Santana Row).
- Variety of wellness benefits covering fitness, mental health, and more.
- Daily lunch and dinner in our office.
- Unlimited compute budget subject to ROI justification.
Pay
- Competitive salary based on experience and qualifications.
Schedule
- Full-time position.