Y1da63722700-700 | Ehrm Infrastructure Upgrades | Asheville, Nc |
Notice ID: 05c449abe73f48f19210989d7b0cd554 | Solicitation Number: 36C77626R0066 | Set-Aside: SDVOSBC | Posted: August 6, 2026 | Contracting Officer: Andrew Mathews (216-447-8300, Andrew.Mathews2@va.gov)
Project Summary
Amendment 0007 has been posted. This amendment responds to RFIs, updates Attachment 9, provides Addendum 1, and extends the date for receipt of offers to August 17, 2026 at 3:00 PM EDT. The update to Attachment 9 corrects the incorrect solicitation number and location in the header. Specifications and drawings found in Addendum 1 dated 8-6-26 replace the corresponding specification section or drawing in the original package.
Previous amendments:
- Amendment 0006: Extends the date for offers due to August 14, 2026 at 3:00 PM EDT.
- Amendment 0005: Extends the date for offers due to August 7, 2026 at 3:00 PM EDT. Adds FAR clause 52.212-4 and removes FAR clauses 52.249-2 and 52.249-10.
- Amendment 0004: Extends the date for offers due to July 27, 2026 at 3:00 PM EDT.
- Amendment 0003: Extends the date for offers due to July 13, 2026 at 3:00 PM EDT.
- Amendment 0002: Extends the date for offers due to July 1, 2026 at 3:00 PM EDT.
- Amendment 0001: Adds the site visit sign-in sheet and agenda from the site visit on June 9, 2026.
Scope of Work
The contractor shall provide all tools, equipment, materials, labor, supervision, and management to complete the construction of infrastructure upgrades to the campus. Construction practices shall comply with all VA solicitation drawings and specifications, VA regulations, procedures, and conditions for work at the medical center, and any applicable codes as per requirements of all governing agencies.
Work includes, but is not limited to:
- Electrical upgrades (electrical panel upgrade, normal and emergency power)
- Bonding and UPS systems
- Building Management System interfaces
- Assessment for new and upgrades to existing HVAC
- Reconfiguration, expansion, and renovation of existing space (demolition, new construction, finishes, cabling)
- Renovation of Datacenter work (HVAC, UPS, power distribution, cable management, space expansion, fire suppression, finishes)
- Communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable)
- Physical security upgrades
- Assessment and upgrade of fiber infrastructure backbone campus-wide (within and between buildings)
- Provision of a diversified path for wide area network connection
- Hazardous material abatement
Project buildings include: Buildings 47, 62, 14, 15, 9, 7, 6, 5, 4, 3, 2, 73, 70, 11, 12, and site work.
The contractor shall complete the intent of project 637-22-700 in strict accordance with the drawings and specifications. All work not specifically identified by the drawings and/or specifications but necessary for a complete system shall be included as if specifically identified in the contract documents.
Bid Deadline
August 17, 2026 at 3:00 PM EDT
Attached Files
26 contract documents are available for review on SAM.gov.