Warehouse Selector, Second Shift Sunday through Thursday
Vistar · South Windsor, CT · 5 days ago
Management$22–$24/hrFull-time
Position Responsibilities
- Follow all preferred work methods, safety policies and procedures per company guidelines.
- Ensure work area is safe and report any unsafe conditions and/or acts immediately.
- Review work schedule, obtain supplies required to perform the work and prepare for operations.
- Perform a safety check on pallet jack/forklift to be used and insure that all other safety devices are functioning properly.
- Put on all required Personal Protective Equipment and Safety Gear.
- Maintain required productivity and accuracy standards per location and company guidelines.
- Place pallets on pallet jack and operate along assigned multi-level racks and locate products according to order sheets.
- Manually place the appropriate stock items on pallet from pick slots and racks as required.
- Use single and/or double pallets as directed.
- Transport completed palletized customer order to shipping dock staging area.
- May be required to shrink-wrap pallet for staging.
- Remove batteries requiring recharging, replace with charged batteries, or attach re-charger and complete vehicle inspection checklist.
- Secure all equipment and complete all necessary paperwork at the end of the shift.
- Perform other related duties as assigned.
Required Qualifications
- A High School Diploma/GED or Equivalent.
- Experience: 6-12 months of warehouse and/or distribution work experience, 6-12 months of electric pallet jack experience.
- Ability to work the scheduled / assigned times and required overtime for the position.
- Standing, walking, reaching and lifting repeatedly throughout shift.
- Lifting and stacking product between 10-35 pounds and up to 80 pounds occasionally throughout shift.
- Working in multi-temperature environments, i.e. cooler, freezer and dry.
- Pass pre-employment drug test.
Pay
Earn $20/hr + $2 shift differential + $2 cooler/freezer diff + incentives.
Schedule
Full-time | Sun-Thurs | 2nd shift
Sunday start: 3:30 PM
Monday-Thursday start: 4:30 PM
Shift ends when daily work is completed; end times may vary based on volume.