TAR Critical Path Scheduler
Burrow Global, LLC · La Porte, TX · 1 mo ago
On-siteManagement$10/hrFull-time
Position Summary
The TAR Scheduler will be responsible for developing, maintaining, and analyzing detailed turnaround schedules while supporting construction execution, procurement tracking, and pre-turnaround planning activities. The successful candidate will serve as the critical path scheduling expert, ensuring schedule integrity and providing actionable insights that drive project success.
Responsibilities
- Develop and maintain detailed turnaround schedules using Primavera P6.
- Perform critical path analysis and schedule optimization.
- Execute resource planning, loading, and leveling activities.
- Integrate client-provided SAP work order data into project schedules.
- Track procurement activities and long-lead equipment deliveries.
- Develop detailed execution schedules for a 24/7, 13-day turnaround event, including shift-level performance tracking.
- Support planning and scheduling efforts for ancillary capital and maintenance projects involving engineering, procurement, and construction activities.
- Capture and schedule all pre-turnaround activities, including:
- Pre-fabrication
- Pre-work execution
- Long-lead material tracking
- Construction readiness activities
- Collaborate with project managers, planners, procurement personnel, operations, maintenance, and contractors to ensure schedule accuracy and alignment.
- Monitor schedule performance and communicate schedule risks, opportunities, and mitigation plans.
Required Qualifications
- Minimum 8 years of industrial scheduling experience.
- Demonstrated experience serving as a critical path scheduler on turnaround, shutdown, outage, or large construction projects.
- Advanced proficiency with Primavera P6, including:
- Resource Planning
- Resource Loading
- Resource Leveling
- Critical Path Analysis
- Experience utilizing SAP work orders for planning and scheduling purposes.
- Strong understanding of construction sequencing and procurement tracking.
- Experience supporting petrochemical, refining, chemical, or other heavy industrial facilities.
- Ability to synthesize large amounts of information into comprehensive, executable schedules.
- Self-motivated professional capable of working independently while collaborating effectively with multidisciplinary teams.
Turnaround Scope Includes
The turnaround will involve planning and scheduling activities for equipment and work scopes such as:
- PSV and Control Valves
- Air Compressors
- Columns
- Vessel Cleaning
- Piping
- Electrical Systems
- Rotating Equipment
- Mechanical and Regulatory Inspections
- Corrosion Under Insulation (CUI)
- Water Blasting Operations