Senior Product Test Engineer
About Etched
Etched is building hardware for frontier intelligence. We co-design chips, racks, software, and manufacturing to deliver best-in-class throughput and latency across both prefill and decode workloads. Our first products are heavily focused on inference. Backed by hundreds of millions from top-tier investors and staffed by leading engineers, Etched is redefining the infrastructure layer for the fastest growing industry in history.
Responsibilities
- Design and build backend services, APIs, and data pipelines that support manufacturing test and factory operations.
- Own software for manufacturing release management, deployment, versioning, and traceability across production environments.
- Develop scalable manufacturing data platforms for test results, yield analysis, genealogy, and production reporting.
- Build reusable manufacturing test station applications, operator interfaces, and automation frameworks.
- Integrate manufacturing software with MES, SFIS, and other factory systems used by contract manufacturers.
- Partner with Manufacturing Test, Hardware, Firmware, Software, Quality, and NPI teams to support product development through production ramp.
- Productionize prototype engineering tools into reliable, production-ready manufacturing software.
- Travel to domestic and international manufacturing partners to support factory bring-up and production deployments.
Requirements
- 6+ years of experience building production software, backend services, or data platforms.
- Strong Python development experience (or equivalent expertise in Go, Java, C#, or TypeScript with Python proficiency).
- Strong software engineering fundamentals including testing, CI/CD, version control, code review, debugging, and production monitoring.
- Experience designing scalable APIs, databases, data models, and distributed systems.
- Experience integrating software with external systems and building reliable production services.
- Experience developing internal applications, dashboards, or operator-facing software.
- Comfortable owning technical architecture and building greenfield software platforms.
- Bachelor's degree in Computer Science, Software Engineering, or equivalent practical experience.
- Willingness to work onsite from our San Jose office and travel internationally to manufacturing partners as needed.
Skills
Strong Candidates May Also Have Experience With:
- Manufacturing software, factory automation, MES, SFIS, or production operations.
- Manufacturing test software, hardware validation, or automated test infrastructure.
- Yield analysis, manufacturing analytics, traceability, or genealogy systems.
- Firmware release tooling or embedded software development.
- AI servers, accelerator systems, networking hardware, storage systems, or other high-performance compute platforms.
- Supporting first-generation hardware products through manufacturing scale-up in a fast-paced startup environment.
Benefits
- Medical, dental, and vision packages with generous premium coverage
- $500 per month credit for waiving medical benefits
- Housing subsidy of $2k per month for those living within walking distance of the office
- Relocation support for those moving to San Jose (Santana Row)
- Various wellness benefits covering fitness, mental health, and more
- Daily lunch + dinner in our office
About the Team
Etched believes in the Bitter Lesson. We are the first inference-focused frontier AI system, betting early on transformer and transformer-like architectures and on increasing model sizes. Our addressable market is the entirety of inference, unlike many of our competitors. We are a fully in-person team in San Jose (Santana Row), and greatly value engineering skills. We do not have boundaries between engineering and research, and we expect all of our technical staff to contribute to both and work across disciplines as needed.