Jobs · Engineering · North Carolina

Senior Mechanical Project Manager - Data Center Construction

Turner & Townsend · Maiden, NC · 4 mo ago
On-siteEngineeringFull-time

About the role

Turner & Townsend is seeking a Senior Mechanical Construction Project Manager to oversee the construction phase, commissioning, and close-out of a massive, state of the art data center project for a global technology client onsite in Maiden, North Carolina.

Responsibilities

  • Lead and manage the mechanical construction activities, ensuring the project is delivered on time, within budget, and to the highest quality standards.
  • Oversee mechanical system installations, including HVAC, mechanical, plumbing, fire protection, and associated systems.
  • Ensure that the mechanical designs are aligned with the overall design intent and client expectations, managing any issues that arise during construction.
  • Manage and supervise mechanical subcontractors, vendors, and suppliers, ensuring that work is completed to specification and safety standards.
  • Conduct regular site inspections to ensure compliance with building codes, regulations, and safety protocols.
  • Provide technical guidance and troubleshooting on mechanical system installations, ensuring that all work is completed as per the contract documents and specifications.
  • Oversee the commissioning process of mechanical systems to ensure all systems are fully operational and meet performance criteria.
  • Lead the mechanical system testing and commissioning process, ensuring all relevant documentation (test reports, as-builts, O&M manuals) are accurate and handed over to the client.
  • Assist in the final project closeout and ensure the mechanical systems are handed over seamlessly to the client.
  • Act as the primary point of contact between the client and the construction team for mechanical-related issues.
  • Provide advice and recommendations to the client, ensuring their interests are protected throughout the project lifecycle.
  • Proactively identify and manage risks related to mechanical systems and recommend mitigation strategies.
  • Ensure all mechanical work adheres to quality standards and local regulations.
  • Review and approve subcontractor invoices and work schedules.
  • Conduct site safety audits and ensure that work is being performed in compliance with all health and safety standards.
  • Monitor and report on the progress of mechanical work against the project schedule and budget.
  • Track project costs, identifying and addressing cost overruns or delays.
  • Ensure that changes in scope are managed efficiently, with appropriate documentation and approval processes in place.
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable.

Qualifications

  • A Bachelor's degree in Mechanical Engineering or a related field. Professional certifications (e.g., PMP, LEED) are a plus.
  • A minimum of 8 years of experience in mechanical project management, with experience working on data center construction projects.
  • Proven experience managing large, complex mechanical systems installations and commissioning processes.
  • Expertise in mechanical systems commonly used in data centers, such as HVAC, cooling, fire suppression, and energy management systems.
  • Experience with Owner’s Representation and working directly with clients, contractors, and other stakeholders.

Skills

  • Strong understanding of mechanical design, construction methods, and systems integration.
  • Excellent project management skills, including planning, scheduling, and budgeting.
  • Strong leadership and team management abilities.
  • Proficient in construction management software and tools (e.g., Procore, MS Project, BIM).
  • Excellent communication skills, with the ability to present technical information to both technical and non-technical stakeholders.

Personal Attributes

  • Hightly organized with attention to detail and a commitment to quality.
  • Strong problem-solving skills and ability to work under pressure.
  • Ability to navigate complex stakeholder relationships and manage expectations effectively.
  • Client-focused and proactive in identifying and resolving issues.

Similar jobs