Senior Low Voltage Estimator - Data Center Construction
Turner & Townsend · San Francisco, CA · 2 mo ago
RemoteRemoteConsulting$130k–$160k/yrFull-time
Responsibilities
- Provide estimate and cost planning to include producing and presenting the final cost plan.
- Able to estimate at conceptual, programming and detailed level.
- Assist on feasibility studies and writing procurement reports.
- Perform all aspects of procurement, including managing the pre-qualification stage, produce bid list, bid analysis, produce bid report, and compile contractual documents.
- Participate effectively with post contract cost variances and the change control processes, where applicable refer major changes to line manager.
- Manage cost checks and carry out valuations on larger projects, and ensure timely and accurate cost checking, and valuation process.
- Produce monthly post contract cost reports and present to client.
- Provide input into value engineering; negotiate and approve final accounts.
- Maintain liaison with client and other consultants at all projects stages.
- Provide leadership to cost management team, when necessary, ensure the delivery on all of accountabilities.
- Identify opportunities to develop new business with existing clients and report such opportunities to appropriate line manager and utilize marketing database.
- Identify improvements for cost management procedures, templates, and products, and refer ideas to leadership.
Qualifications
- Low Voltage B experience is required: Telecom, Security, Audio Visual, etc. (30v and below) on large, high-value construction projects.
- Good technical experience in all cost management areas; pre-contract, post contract and final account.
- College degree in (Electrical) Engineering, Construction Management or a related technical field, and/or field-related experience.
- Demonstrate solid presentation, verbal, written, and communication skills.
- Excellent communicator and thrives in a client facing role.
- Good organization skills, ability to multi-task, and be a team player.
- Good knowledge of all methods of construction procurement.
- Experience with advising clients on value management, value engineering, and life cycle costing.
- Experience with key aspects of business development.
Additional Information
The salary range for this full-time role is $130K - $160K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package. Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications.