Senior Construction Scheduler
Benefits
- 401(k) matching
- Dental insurance
- Health insurance
- Paid time off
- Tuition assistance
- Vision insurance
- Bachelor’s Degree in in Architecture, Engineering, or Construction Management.
- 10+ years of relevant project controls, project analyst experience demonstrating increasing levels of responsibility in terms of project size and sophistication, preferably in wastewater.
- PMI-SP, PSP highly desired (Planning and Schedule Professional)
- Experience with advanced scheduling principles using Primavera 6 (P6), MS Project or other related system applications is required.
- Excellent verbal, communication, and interpersonal skills; Proficiency with Microsoft Office especially Word and Excel.
Responsibilities and Tasks
Develop, manage, update, and monitor individual project schedules and integrated overall master program schedule.
Review project documents and specifications to accurately develop baseline schedules which include all required dates, activities and milestones.
Perform progress schedule update reviews to include comprehensive reporting and narratives.
Review schedule, progress and productivity of consultants and contractors, monitor and verify monthly costs and earned value, conduct change order management and control.
Develop, manage, and monitor program and project specific budgets, cash flow projections and forecasts.
Cost and resource management and reporting.
Establish and ensure scheduling and cost control standards are implemented.
Progress payment application reporting.
Participate in meetings with project teams, clients, owners and various stakeholders related to the project controls and schedule of a particular project.
Development and analysis of what-if scenarios including risk mitigation strategies and support for the tracking of key performance metrics (CPI, SPI, critical path, float density, variance, etc.)
Delay and Time Impact Analysis of Schedule
Quality – adhere and verify quality standards are met within deliverables produced by project team, consultants, and contractors
Education & Experience Requirements
About Us
DM Enterprise (DME) is multi-disciplinary engineering MBE/DBE firm located in Maryland. DME offers a wide range of civil engineering services including, water/wastewater utilities engineering services, environmental engineering, construction management, geospatial technology, IT solutions, inspection services, program management, project controls, constructability review, geotechnical, structural design and valve assessment for both public agencies and private corporations. DME’s principals have over 50 years of combined experience and are committed to achieving the highest safety standards on all of their projects while bringing a unique set of capabilities when serving as the project owner’s representative. DME routinely incorporates risk analysis and mitigation on all projects while ensuring that the proper budgetary controls and cost constraints are integrated to ensure that projects are completed on time and within budget.