Restoration of piers in Pearl Harbour
Aquajet Systems LatAm & Caribbean · Pearl, MS · Yesterday
OTHRFull-time
About the role
Triton Marine Construction uses a hydrodemolition robot, the Aqua Cutter HD-6000, to remove spalled concrete from two piers at Pearl Harbour, Oahu, Hawaii.
Responsibilities
- Removal of spalled concrete and corroded rebar
- Replacement with new materials
- Completion of 3,000 sq ft (280m2) of concrete removal in phases
- Adjustment of parameters for precise and efficient removal
- Flexibility to handle different shapes and sizes of areas to be removed
Requirements
The project involved the removal of concrete from the decks of the two piers, with areas ranging from 100 sq ft (9m2) to 110m2.
Qualifications
No specific qualifications are mentioned, but familiarity with the Aqua Cutter HD-6000 was gained through training and practical experience.
Skills
- Proficiency in operating the Aqua Cutter HD-6000
- Ability to adjust parameters for precise removal
- Knowledge of the unique properties of the concrete (black, porous, volcanic)
Benefits
The use of hydrodemolition has led to significant improvements in production rates compared to traditional methods, reducing the time needed to complete projects.
Pay
The pay details are not specified in the job posting.
Schedule
The schedule is not specified in the job posting.