Project Engineer (Electrical) - Data Center Construction
EPI Power · Cedar Rapids, IA · 4 wk ago
ManagementFull-time
About the role
EPI Power is seeking a Project Engineer to join their team. This role involves planning, buyout, management, and closeout of assigned projects, assisting the project team in monitoring project status, and identifying issues that may impact the project schedule and/or budget.
Responsibilities
- Review electrical drawings, specifications, and project scope
- Cook with VDC team and review BIM/shop drawings
- Aid in submittals preparation and tracking
- Support procurement and material tracking
- Participate in coordination and project meetings
- Support prefabrication coordination
- Maintain engineering logs and documentation
- Coordinate with Engineering, VDC, Procurement, and Field teams
- Ensure compliance with project drawings and specifications
- Support Engineering Project Manager and Project Manager
- Identify and help resolve technical and coordination issues
- Support quality control and installation verification
- Assist with as-built documentation and project closeout
- Track engineering deliverables and project deadlines
- Coordinate with field team and provide technical support
- Issue and track RFIs
- Support preparation and tracking of MTOs
- Support engineering deliverables (cable schedules, panel schedules, as-builts)
Requirements
The ideal candidate is open to travel and/or relocation based on upcoming project needs. EPI is hiring both entry-level and experienced Project Engineer candidates. This role requires the ability to work 6 days per week, Monday – Saturday.
Qualifications
- Experience: 1-2 years of experience as a Project Engineer or in a similar role, industry related degree/coursework, or related internship experience
- Engineering degree is a plus
- LEAN principles experience is desirable
- Knowledge of NEC code is a plus
Skills
- Displays a high level of initiative and is comfortable making independent judgement
- An analytical thinker who enjoys solving problems
- Excellent written and verbal communication skills
- Desire to work in a collaborative, supportive, team environment
- Organized and a high attention to detail
- Flexibility
- Technology: Proficient in basic computer software including Microsoft Word, PowerPoint, Excel, and Outlook
- Autodesk software programs (Revit AutoCAD and Navisworks)
- Ability to learn specific job-related software upon hire (JDE, Procore, Bluebeam, scheduling software, etc.)
Benefits
- Competitive Pay
- Comprehensive Benefits Package with Tax-Advantaged HSA and FSA offerings
- Employer-Paid Short- and Long-Term Disability Programs
- Employer-Paid Life Insurance
- Generous Paid Time Off
- Provision for 401K Retirement Savings Plan with Company Match
- Tuition Reimbursement
- Full Paid Parental Leave
- Voluntary Products Including: Critical Illness Insurance and Accident Insurance
- Corporate Wellness Program with Wellness Time Off and Rewards